|
|
Bid Results
|
IMPORTANT NEWS & UPDATES:
THE DIVISION OF FACILITIES DEVELOPMENT (DFD) WILL NOW BE ACCEPTING CONSTRUCTION BIDDING DOCUMENTS FOR BID OPENINGS IN MADISON, WI AS FOLLOWS:
- PDF scanned file of all required bid documents, including bid and bid bond forms with original wet signatures or properly transmitted electronic signatures
(only PDF files will be accepted) emailed to doadfdmbidsubmission@wisconsin.gov (this is the preferred method);
- US Mail (United States Postal Service) or Third-pardy delivery (UPS, Fedex, or DHL) to the State of Wisconsin Administration Building; or
- Hand delivery to the drop box labeled SEALED BIDS ONLY in front of the State of Wisconsin Administration Building located at 101 East Wilson Street, Madison, Wisconsin 53703.
IN ADDITION, DFD WILL NOW ALSO ACCEPT THE FOLLOWING FOR ALL CONSTRUCTION BIDDING DOCUMENTS:
- PDF files with electronic signatures using a remote online signature or notarization technology provider (approved providers only). Electronic signatures must also be accompanied by telephone numbers for all signatories as well as the bond principal and issuing surety on bond documents for oral verification (only PDF files will be accepted) emailed to doadfdmbidsubmission@wisconsin.gov (this is the preferred method).
In order to ensure that bids are received and processed, ALL must be delivered by 1:00 P.M. CDT on the day that the bid submission is due REGARDLESS OF DELIVERY METHOD.
Bidders may submit PDFs of bid forms, bonds, and powers of attorney containing e-signatures, e-corporate seals, and e-notaries affixed to each document in accordance with the Surety’s obligations. We will require telephone numbers for all signatories as well as the bond principal and issuing surety for oral verification. Bids must be accompanied by a bid guarantee, which may take the form of a properly executed DFD form of bid bond. If a bidder elects to use a bid bond as their bid guarantee, such bid bond must be accompanied by a power of attorney, which DFD will only accept as genuine if it is properly notarized. Wisconsin law permits the use of (electronic) remote online notarization if it is performed using technology providers that have been approved by the Department of Financial Institutions (DFI). If a bidder elects to use remote online notarization it is the responsibility of the bidder and its surety to ensure that the technology provider has been approved by DFI. DFD reserves the right to reject bids submitted electronically if a bidder uses a remote online notarization technology provider that has not been approved by DFI.
Bid forms containing electronic signatures must be obtained using approved software in order to be accepted. DocuSign software and Adobe Digital Signature software are approved for e-signatures for submission of bids. Use of any other e-signature software will require additional verification and approval at least three (3) business days prior to submission of bids. Please contact doadfdmbidsubmission@wisconsin.gov regarding any proposed electronic signature software. Failure to obtain pre-approval may result in bid rejection.
Any email submissions should receive a reply. If a reply is not received within thirty minutes after PDF bid is emailed, please contact DFD at (608) 266-7066 or (608) 261-7758. Each bid package must be submitted in a separate email as a scanned PDF file of all required bid documents. Size limit is 20 MB per email. The email subject line must use the following format: “Project Number – Bid Category/Division of Work – Company Name". Only PDF files will be accepted via email. Bids and bid bond forms must be signed with original wet signatures or properly transmitted electronic signatures using a remote online notarization technology provider that have been approved by the Department of Financial Institutions (DFI), where required. DFD will require the apparent low bidders to submit “hard copy" versions of their bid documents. DFD may also require the other bidders to submit hard copy versions of bid documents before any contracts are initiated. Hard copy versions must be received within seven (7) days of request.
Awarded contracts may be signed via DocuSign. However, the contractor may still choose to print, sign, and mail paper contract. If a contractor chooses to sign contract and contract documents electronically via DocuSign, they must attach their remote notarized Performance Bond, Payment Bond, Power of Attorney, and Corporate Resolution using technology providers that have been approved by the Department of Financial Institutions (DFI), to the DocuSign envelope. This is the preferred method and more detailed instructions will be provided with contract offer correspondence.
All bids, regardless of delivery method, are due by 1:00 P.M. CDT on the day that the bid submission is due. Bidders are responsible for the bid being delivered before the time specified and delivery is entirely at the bidder's risk. Therefore, bidders are highly encouraged to use email PDF to submit bids.
Bid openings will be conducted via Microsoft Teams. Bidders may call the Madison Microsoft Teams teleconference number: (608) 571-2209, 484 588 360# , on the day of the bid to hear the bid results announced on the day bids are due. The conference line will be open at 1:45 P.M. CDT and all bids will be opened after 2:00 P.M. CDT. All in-person bid openings have been discontinued.
This web page is an electronic listing of Dept. of Administration, Division of Facilities Development (DFD) construction projects being bid or for which proposals will be solicited in the near future.
The page is best viewed using Internet Explorer, as some functions may not work correctly if using other browser software.
- To view bidding documents click on the project title.
- To view a DFD plan holders list, click on the “Plan Holders” link next to the project number. Plan holders lists are provided as a courtesy, DFD is not responsible for any errors or inaccuracies. The plan holders lists do not necessarily reflect all possible bidders.
- If a revised date is displayed under the project number, click on the underlined date to display a description of the revisions.
- To view a list of projects already bid, including bid opening tabulations and construction contracts that have been issued, click on the 'Bid Results' link to the left.
- Please note that an RSS feed of this page is available by clicking on the following icon
- Notices of Proprietary Acquisition are located at the bottom of this page.
|
|
List of Projects Out for Bid Thursday, Sep 21 2023
Project Number | Plans Available On | Bid Date | Project Title/Bid Documents | Agency/Institution/Building | A/E | Estimate Construction Cost | Project Manager | Prebid Tour Date | Prebid Tour Mandatory |
20B3LREBID2 GPC
|
9/19/2023
Plan Holders
|
11/30/2023
|
North Building Units 9 and 10 Wet Cell Remodel
|
HEALTH SERVICES/
WISCONSIN RESOURCE CENTER, WINNEBAGO
/WIS RES CTR-NORTH
|
Venture Architects
|
$4,500,000
|
Schaefer
|
11/2/2023
| No |
17I1K-04 GPC
|
9/20/2023
Plan Holders
|
11/29/2023
|
Tavern Renovations
|
HISTORICAL SOCIETY/
OLD WORLD WISCONSIN ETHNIC OUTDOOR MUSEUM, EAGLE
|
Aro Eberle Architects
|
$950,000
|
Schaefer
|
10/25/2023
| No |
20B3LREBID2 MEP
|
9/19/2023
Plan Holders
|
11/15/2023
|
North Building Units 9 and 10 Wet Cell Remodel
|
HEALTH SERVICES/
WISCONSIN RESOURCE CENTER, WINNEBAGO
/WIS RES CTR-NORTH
|
Venture Architects
|
$4,500,000
|
Schaefer
|
11/2/2023
| No |
17I1K-04 MEP
|
9/20/2023
Plan Holders
|
11/14/2023
|
Tavern Renovations
|
HISTORICAL SOCIETY/
OLD WORLD WISCONSIN ETHNIC OUTDOOR MUSEUM, EAGLE
|
Aro Eberle Architects
|
$950,000
|
Schaefer
|
10/25/2023
| No |
19D2A-01REBID GPC
|
9/8/2023
Plan Holders
|
11/8/2023
|
Alternate Water Supply Pump Replacement
|
HEALTH SERVICES/
WINNEBAGO MENTAL HEALTH INSTITUTE
/RESERVOIR
|
Ruekert & Mielke, Inc.
|
$375,000
|
Kalscheur
|
10/10/2023
| No |
20K1G-01 GPC
|
9/20/2023
Plan Holders
|
11/8/2023
|
New Academic Building
|
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
|
Ramlow/Stein, Inc.
|
$73,393,000
|
Dapp
|
10/2/2023
| No |
21H1JREBID GPC
|
8/30/2023
Plan Holders
|
11/7/2023
|
Deppe Wagon Pavilion Mold Remediation and Improvements
|
HISTORICAL SOCIETY/
CIRCUS WORLD MUSEUM, BARABOO
/DEPPE WAREHOUSE BLDG
|
InSite Consulting Architects, LLC
|
$1,535,000
|
Becker
|
9/26/2023
| No |
21K1CREBID GPC
|
8/29/2023
Plan Holders
|
11/2/2023
|
EHRM Infrastructure Upgrades
|
VETERANS AFFAIRS/
WISCONSIN VETERANS HOME-UNION GROVE
/SHEMANSKE HALL
|
Berners-Schober Associates, Inc.
|
$405,000
|
Becker
|
| No |
18H2JREBID3 GPC
|
9/7/2023
Plan Holders
|
10/26/2023
|
New Secure Residential Treatment Unit and Diversion Unit
|
CORRECTIONS/
OSHKOSH CORRECTIONAL INSTITUTION, OSHKOSH
|
Venture Architects
|
$1,884,000
|
Hoffmann
|
9/27/2023
| No |
20E3P GPC
|
9/19/2023
Plan Holders
|
10/26/2023
|
Roof Replacement
GPC Only
|
TRANSPORTATION/
DBM - BUSINESS MANAGEMENT FACILITIES
|
Cedar Corporation
|
$963,200
|
Balciunas
|
10/12/2023
| No |
21L2J-02 GPC
|
9/6/2023
Plan Holders
|
10/26/2023
|
Pit C to Pit B Steam Line Replacement
Addenda to Date: 1
|
CORRECTIONS/
OAKHILL CORRECTIONAL INSTITUTION, OREGON
/HEATING PLANT - OHCI
|
Affiliated Engineers, Inc.
|
$700,000
|
Cunat
|
10/3/2023
| No |
22A2J GPC
|
9/12/2023
Plan Holders
|
10/26/2023
|
Elevator Modernization
|
UNIVERSITY OF WISCONSIN/
PARKSIDE CAMPUS
/UNION - STUDENT CENTER (Student Center)
|
Bloom Companies LLC
|
$417,300
|
Hall
|
9/22/2023
| No |
19D2A-01REBID MEP
|
9/8/2023
Plan Holders
|
10/25/2023
|
Alternate Water Supply Pump Replacement
|
HEALTH SERVICES/
WINNEBAGO MENTAL HEALTH INSTITUTE
/RESERVOIR
|
Ruekert & Mielke, Inc.
|
$375,000
|
Kalscheur
|
10/10/2023
| No |
20K1G-01 MEP
|
9/20/2023
Plan Holders
|
10/25/2023
|
New Academic Building
|
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
|
Ramlow/Stein, Inc.
|
$73,393,000
|
Dapp
|
10/2/2023
| No |
21L1I GPC
|
8/29/2023
Plan Holders
|
10/25/2023
|
Bathroom Remodel
Addenda to Date: 1
|
CORRECTIONS/
FOX LAKE CORRECTIONAL INSTITUTION, FOX LAKE
/SPECIAL MANAGEMENT UNIT
|
KonText Architects, LLC
|
$325,000
|
Balciunas
|
9/26/2023
| No |
21H1JREBID MEP
|
8/30/2023
Plan Holders
|
10/24/2023
|
Deppe Wagon Pavilion Mold Remediation and Improvements
|
HISTORICAL SOCIETY/
CIRCUS WORLD MUSEUM, BARABOO
/DEPPE WAREHOUSE BLDG
|
InSite Consulting Architects, LLC
|
$1,535,000
|
Becker
|
9/26/2023
| No |
21I2T GPC
|
8/30/2023
Plan Holders
|
10/24/2023
|
Food Service Equipment Replacement
|
HEALTH SERVICES/
SOUTHERN WISCONSIN CENTER, UNION GROVE
|
KonText Architects, LLC
|
$1,895,000
|
Janus
|
9/19/2023
| No |
21L3Q GPC
|
9/15/2023
Plan Holders
|
10/24/2023
|
Unit 4 Roof Replacement
GPC Only.
|
CORRECTIONS/
STANLEY CORRECTIONAL INSTITUTION, STANLEY
|
Lien & Peterson Architects, Inc.
|
$558,600
|
Hoffmann
|
10/10/2023
| No |
22F3O
(Proposal)
|
9/15/2023
Plan Holders
|
10/24/2023
|
Repair Naturalist and Accessible Cabins
|
NATURAL RESOURCES/
COPPER FALLS STATE PARK
/SPECIAL USE - INTERPRETIVE CENTER
|
Lien & Peterson Architects, Inc.
|
$85,000
|
Kolaszewski
|
| No |
19D1V GPC
|
9/1/2023
Plan Holders
|
10/19/2023
|
University Health Services Floors 7-8 Renovation
|
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
/East Campus Mall 333 (Univ Square)
|
Potter Lawson, Inc.
|
$2,223,000
|
Janus
|
9/18/2023
| No |
20A1OREBID2
(Proposal)
|
9/7/2023
Plan Holders
|
10/19/2023
|
South Housing Ventilation Upgrades
|
CORRECTIONS/
PRAIRIE DU CHIEN CORRECTIONAL FACILITY
/BUILDNG F-SOUTH HOUSING
|
Thunderbird Engineering, Inc.
|
$145,000
|
Stephan
|
9/27/2023
| No |
21K1CREBID MEP
|
8/29/2023
Plan Holders
|
10/19/2023
|
EHRM Infrastructure Upgrades
|
VETERANS AFFAIRS/
WISCONSIN VETERANS HOME-UNION GROVE
/SHEMANSKE HALL
|
Berners-Schober Associates, Inc.
|
$405,000
|
Becker
|
| No |
22C1Y STC
|
9/7/2023
Plan Holders
|
10/19/2023
|
Building Automation System Upgrades
Single Trade Contract - Mechanical
|
CORRECTIONS/
KETTLE MORAINE CI-PLYMOUTH
|
Dynamic Consulting Engineers LLC
|
$1,700,000
|
DeValk
|
9/19/2023
| No |
23F3E
(Proposal)
|
9/12/2023
Plan Holders
|
10/19/2023
|
State Capitol Lighting Controls Upgrades
|
ADMINISTRATION/
ADMINISTRATIVE FACILITIES
/WISCONSIN STATE CAPITOL
|
Design Engineers
|
$60,000
|
List
|
10/5/2023
| No |
18I1N GPC
|
9/15/2023
Plan Holders
|
10/18/2023
|
Box Culvert Removal and New Bridge Construction
GPC Only
|
NATURAL RESOURCES/
STATEWIDE
|
Cedar Corporation
|
$2,500,000
|
Shumaker
|
9/28/2023
| No |
19F1YREBID GPC
|
8/25/2023
Plan Holders
|
10/18/2023
|
HVAC System Renovation
|
UNIVERSITY OF WISCONSIN/
EAU CLAIRE CAMPUS
/CHANCELLORS HALL
|
HVP Design, Inc.
|
$1,136,500
|
Stephan
|
| No |
22D3C GPC
|
8/29/2023
Plan Holders
|
10/18/2023
|
Air Handling Unit and Air Distribution Upgrades
|
ADMINISTRATION/
ADMINISTRATIVE FACILITIES
/EAU CLAIRE STATE OFFICE BLDG
|
Cedar Corporation
|
$1,700,000
|
Crawford
|
9/14/2023
| No |
23C1S
(Proposal)
|
9/1/2023
Plan Holders
|
10/18/2023
|
Flooring Replacement
|
UNIVERSITY OF WISCONSIN/
GREEN BAY CAMPUS
/STUDENT UNION
|
Architects Group Limited
|
$126,500
|
Hoffmann
|
10/3/2023
| No |
23D1UREBID
(Proposal)
|
9/12/2023
Plan Holders
|
10/18/2023
|
PRV-4 Discharge Pipe Modification
|
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
/CS-HEATING/COOLING PLANT
|
Juhl Energy, Inc. dba Power Engineers Collaborative LLC
|
$100,000
|
Jansen
|
| No |
21K1O GPC
|
9/7/2023
Plan Holders
|
10/17/2023
|
Exterior Envelope Repairs
GPC Only.
|
UNIVERSITY OF WISCONSIN/
MILWAUKEE CAMPUS
/KENILWORTH
|
Strang, Inc.
|
$1,415,000
|
Hoffman
|
| No |
22A1Y GPC
|
9/7/2023
Plan Holders
|
10/17/2023
|
Readiness Center Roof Replacement
GPC Only
|
MILITARY AFFAIRS/
FORT ATKINSON
/ARMORY-FORT ATKINSON
|
InSite Consulting Architects, LLC
|
$639,450
|
Kirchstein
|
10/3/2023
| No |
22A2IREBID2
(Proposal)
|
9/6/2023
Plan Holders
|
10/17/2023
|
Concrete Stairs and Sidewalk Replacement
|
HEALTH SERVICES/
MENDOTA MENTAL HEALTH INSTITUTE, MADISON
|
Jewell Associates Engineers Inc
|
$248,500
|
Wischhoff
|
10/3/2023
| No |
22C3L
(Proposal)
|
9/11/2023
Plan Holders
|
10/17/2023
|
Repair Shuttle Road Flood Damage
|
NATURAL RESOURCES/
HARRINGTON BEACH STATE PARK
|
AECOM Technical Services Inc
|
$168,000
|
Wischhoff
|
10/6/2023
| No |
18H2JREBID3 MEP
|
9/7/2023
Plan Holders
|
10/12/2023
|
New Secure Residential Treatment Unit and Diversion Unit
|
CORRECTIONS/
OSHKOSH CORRECTIONAL INSTITUTION, OSHKOSH
|
Venture Architects
|
$1,884,000
|
Hoffmann
|
9/27/2023
| No |
21L2J-02 MEP
|
9/6/2023
Plan Holders
|
10/12/2023
|
Pit C to Pit B Steam Line Replacement
Addenda to Date: 1
|
CORRECTIONS/
OAKHILL CORRECTIONAL INSTITUTION, OREGON
/HEATING PLANT - OHCI
|
Affiliated Engineers, Inc.
|
$700,000
|
Cunat
|
10/3/2023
| No |
22A2J MEP
|
9/12/2023
Plan Holders
|
10/12/2023
|
Elevator Modernization
|
UNIVERSITY OF WISCONSIN/
PARKSIDE CAMPUS
/UNION - STUDENT CENTER (Student Center)
|
Bloom Companies LLC
|
$417,300
|
Hall
|
9/22/2023
| No |
22B1L GPC
|
8/8/2023
Plan Holders
|
10/12/2023
|
Detention Door Replacement
|
HEALTH SERVICES/
MENDOTA MENTAL HEALTH INSTITUTE, MADISON
/GOODLAND HALL
|
KonText Architects, LLC
|
$1,344,000
|
Janus
|
8/30/2023
8/31/2023
| No |
21L1I MEP
|
8/29/2023
Plan Holders
|
10/11/2023
|
Bathroom Remodel
Addenda to Date: 1
|
CORRECTIONS/
FOX LAKE CORRECTIONAL INSTITUTION, FOX LAKE
/SPECIAL MANAGEMENT UNIT
|
KonText Architects, LLC
|
$325,000
|
Balciunas
|
9/26/2023
| No |
22L1Z
(Proposal)
|
9/1/2023
Plan Holders
|
10/11/2023
|
Well 1 Rehabilitation
|
HEALTH SERVICES/
MENDOTA MENTAL HEALTH INSTITUTE, MADISON
/SERVICE BLDG 102
|
Water Quality Investigations LLC
|
$150,000
|
Kalscheur
|
| No |
23A1C
(Proposal)
Revised
9/19/2023
|
8/11/2023
Plan Holders
|
10/11/2023
|
Cooling Tower Replacement
Bid Date Rescheduled to 10/11/23 per Addendum 1.
Addenda to Date: 1
|
TRANSPORTATION/
DTD - DISTRICT 3
/NE REGIONAL HDQ-GREEN BAY
|
Berners-Schober Associates, Inc.
|
$192,100
|
Pearce
|
9/6/2023
| No |
21F2N
(Proposal)
|
8/31/2023
Plan Holders
|
10/10/2023
|
Bakery Floor Replacement
|
CORRECTIONS/
WAUPUN CORRECTIONAL INSTITUTION, WAUPUN
/FOOD SERVICE ADDN
|
McGowan Architecture LLC
|
$248,000
|
Wischhoff
|
9/28/2023
| No |
21I2T MEP
|
8/30/2023
Plan Holders
|
10/10/2023
|
Food Service Equipment Replacement
|
HEALTH SERVICES/
SOUTHERN WISCONSIN CENTER, UNION GROVE
|
KonText Architects, LLC
|
$1,895,000
|
Janus
|
9/19/2023
| No |
21J3AREBID
(Proposal)
|
9/7/2023
Plan Holders
|
10/10/2023
|
Secure Cart Path Construction
|
CORRECTIONS/
GREEN BAY CORRECTIONAL INSTITUTION
/SEGREGATION BUILDING
|
Ayres Associates, Inc.
|
$280,000
|
Wischhoff
|
9/28/2023
| No |
22J1P STC
|
8/24/2023
Plan Holders
|
10/10/2023
|
Cooling Coil Replacements
STC - Mechanical
|
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
/KOHL CENTER
|
Berners-Schober Associates, Inc.
|
$1,600,000
|
Coddington
|
9/20/2023
| No |
23A1D
(Proposal)
|
9/6/2023
Plan Holders
|
10/10/2023
|
DoIT Super Node OSP Fiber Install
|
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
/MULTI - BUILDING
|
Affiliated Engineers, Inc.
|
$280,000
|
Lux
|
9/14/2023
| No |
19D1V MEP
|
9/1/2023
Plan Holders
|
10/5/2023
|
University Health Services Floors 7-8 Renovation
|
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
/East Campus Mall 333 (Univ Square)
|
Potter Lawson, Inc.
|
$2,223,000
|
Janus
|
9/18/2023
| No |
21E2UREBID GPC
|
8/23/2023
Plan Holders
|
10/5/2023
|
Multi-Building Historic Homes Renovations
GPC Only
|
UNIVERSITY OF WISCONSIN/
OSHKOSH CAMPUS
/MULTI - BUILDING
|
InSite Consulting Architects, LLC
|
$2,500,000
|
Schaefer
|
9/20/2023
| No |
19F1YREBID MEP
|
8/25/2023
Plan Holders
|
10/4/2023
|
HVAC System Renovation
|
UNIVERSITY OF WISCONSIN/
EAU CLAIRE CAMPUS
/CHANCELLORS HALL
|
HVP Design, Inc.
|
$1,136,500
|
Stephan
|
| No |
22D3C MEP
|
8/29/2023
Plan Holders
|
10/4/2023
|
Air Handling Unit and Air Distribution Upgrades
|
ADMINISTRATION/
ADMINISTRATIVE FACILITIES
/EAU CLAIRE STATE OFFICE BLDG
|
Cedar Corporation
|
$1,700,000
|
Crawford
|
9/14/2023
| No |
22F3Y
(Proposal)
|
8/29/2023
Plan Holders
|
10/4/2023
|
Urban Fishing Pond ADA Pier
|
NATURAL RESOURCES/
RICHARD BONG RECREATION AREA
/AGRICULTURE - GRAIN ENCLOSURE
|
Parkitecture + Planning
|
$100,000
|
Shumaker
|
| No |
22L1Q
(Proposal)
|
8/30/2023
Plan Holders
|
10/4/2023
|
Boardwalk Installation
Addenda to Date: 1
|
NATURAL RESOURCES/
VERNON WILDLIFE AREA
/STORAGE - HEATED-GENERAL
|
Collins Engineers, Inc.
|
$231,200
|
Hall
|
| No |
23A2Y
(Proposal)
|
8/28/2023
Plan Holders
|
10/4/2023
|
AHU 002 Condensate Modification
|
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
/CS-HEATING/COOLING PLANT
|
Ring & DuChateau, LLP
|
$50,000
|
Jansen
|
| No |
20D1C GPC
|
8/11/2023
Plan Holders
|
9/28/2023
|
Boiler Replacement and A/C Installation
|
MILITARY AFFAIRS/
WAUPUN
/ARMORY-WAUPUN
|
JDR Engineering, Inc.
|
$783,000
|
Stephan
|
8/31/2023
| No |
21L1V
(Proposal)
|
9/7/2023
Plan Holders
|
9/28/2023
|
Upgrade Electrical Room 140
Less than 30 bidding days
|
MILITARY AFFAIRS/
CAMP WILLIAMS
/CAMP DOUGLAS READINESS CENTER
|
JDR Engineering, Inc.
|
$141,500
|
Ewing
|
9/14/2023
| No |
22B1L MEP
|
8/8/2023
Plan Holders
|
9/28/2023
|
Detention Door Replacement
|
HEALTH SERVICES/
MENDOTA MENTAL HEALTH INSTITUTE, MADISON
/GOODLAND HALL
|
KonText Architects, LLC
|
$1,344,000
|
Janus
|
8/30/2023
8/31/2023
| No |
21C2IREBID GPC
|
8/10/2023
Plan Holders
|
9/27/2023
|
Boiler Replacement and DDC Installation
Addenda to Date: 1
|
MILITARY AFFAIRS/
MOSINEE
/ARMORY-MOSINEE
|
Salas O’Brien North, LLC
|
$1,286,000
|
Stephan
|
| No |
21H2R GPC
|
8/1/2023
Plan Holders
|
9/27/2023
|
Roof Replacement
GPC Only
|
MILITARY AFFAIRS/
RACINE
/ARMORY-RACINE
|
Specialty Engineering Group LLC
|
$472,500
|
Wenzel
|
9/12/2023
| No |
22A1Z GPC
|
8/8/2023
Plan Holders
|
9/27/2023
|
Roof Replacement
GPC Only
|
MILITARY AFFAIRS/
SPARTA
/ARMORY-SPARTA
|
Specialty Engineering Group LLC
|
$420,000
|
Balciunas
|
9/13/2023
| No |
23B2DREBID2
(Proposal)
|
9/11/2023
Plan Holders
|
9/27/2023
|
Elevator Jack Replacement
Less than 30 bidding days
|
UNIVERSITY OF WISCONSIN/
STEVENS POINT CAMPUS
/COLLEGE-NATURAL RESOURCES
|
Architects Group Limited
|
$215,000
|
Braun-Oddo
|
| No |
23B2F
(Proposal)
|
8/23/2023
Plan Holders
|
9/27/2023
|
Entrance Door and Frame Replacements
Addenda to Date: 1
|
CORRECTIONS/
REDGRANITE CORRECTIONAL INSTITUTION, REDGRANITE
/MULTI-BUILDING
|
Cedar Corporation
|
$200,000
|
Yahnke
|
9/6/2023
| No |
19K1N GPC
|
8/10/2023
Plan Holders
|
9/26/2023
|
Wentz Hall Renovation
Addenda to Date: 3
|
UNIVERSITY OF WISCONSIN/
LA CROSSE CAMPUS
/WENTZ HALL
|
Engberg Anderson, Inc.
|
$1,944,000
|
Yahnke
|
8/22/2023
| No |
21L3H GPC
|
8/1/2023
Plan Holders
|
9/26/2023
|
Building 41 Roof Replacement
GPC Only
Addenda to Date: 1
|
MILITARY AFFAIRS/
CAMP WILLIAMS
/READINESS CTR BLDG 41 (CW)
|
Specialty Engineering Group LLC
|
$476,000
|
Yahnke
|
9/13/2023
| No |
22K1T
(Proposal)
|
8/21/2023
Plan Holders
|
9/26/2023
|
Reverse Osmosis System Installation
Addenda to Date: 1
|
UNIVERSITY OF WISCONSIN/
GREEN BAY CAMPUS
|
Ring & DuChateau, LLP
|
$180,000
|
Otremba
|
9/12/2023
| No |
17D2P-02 GPC
Revised
8/30/2023
|
7/6/2023
Plan Holders
|
9/21/2023
|
First and Second Floor Renovation
FP Rebid 9/7/23, GPC moved to 9/21/23 per Add 3
Addenda to Date: 4
|
MILITARY AFFAIRS/
MILWAUKEE
/ARMORY-MILWAUKEE
|
Boer Architects Inc
|
$1,700,000
|
Becker
|
8/2/2023
| No |
22C1M GPC
|
7/27/2023
Plan Holders
|
9/21/2023
|
Privately Owned Vehicle Parking Reconstruction
Addenda to Date: 1
|
MILITARY AFFAIRS/
REEDSBURG
/ARMORY-REEDSBURG
|
JT Engineering, Inc.
|
$435,000
|
Becker
|
8/25/2023
| No |
22E2E STC
|
8/11/2023
Plan Holders
|
9/21/2023
|
Dust Collector Replacement
STC - Mechanical
Addenda to Date: 1
|
CORRECTIONS/
KETTLE MORAINE CI-PLYMOUTH
/MAINTENANCE/STORAGE
|
Berners-Schober Associates, Inc.
|
$437,000
|
Pearce
|
8/28/2023
| No |
|