IMPORTANT NEWS & UPDATES: 

THE DIVISION OF FACILITIES DEVELOPMENT (DFD) WILL NOW BE ACCEPTING CONSTRUCTION BIDDING DOCUMENTS FOR BID OPENINGS IN MADISON, WI AS FOLLOWS:

  • PDF scanned file of all required bid documents, including bid and bid bond forms with original wet signatures or properly transmitted electronic signatures (only PDF files will be accepted) emailed to  doadfdmbidsubmission@wisconsin.gov (this is the preferred method);
  • US Mail (United States Postal Service) or Third-pardy delivery (UPS, Fedex, or DHL) to the State of Wisconsin Administration Building; or
  • Hand delivery to the drop box labeled SEALED BIDS ONLY in front of the State of Wisconsin Administration Building located at 101 East Wilson Street, Madison, Wisconsin 53703. 

IN ADDITION, DFD WILL NOW ALSO ACCEPT THE FOLLOWING FOR ALL CONSTRUCTION BIDDING DOCUMENTS:

  • PDF files with electronic signatures using a remote online signature or notarization technology provider (approved providers only). Electronic signatures must also be accompanied by telephone numbers for all signatories as well as the bond principal and issuing surety on bond documents for oral verification (only PDF files will be accepted) emailed to doadfdmbidsubmission@wisconsin.gov (this is the preferred method).

In order to ensure that bids are received and processed, ALL must be delivered by 1:00 P.M. CDT on the day that the bid submission is due REGARDLESS OF DELIVERY METHOD.  

Bidders may submit PDFs of bid forms, bonds, and powers of attorney containing e-signatures, e-corporate seals, and e-notaries affixed to each document in accordance with the Surety’s obligations. We will require telephone numbers for all signatories as well as the bond principal and issuing surety for oral verification. Bids must be accompanied by a bid guarantee, which may take the form of a properly executed DFD form of bid bond. If a bidder elects to use a bid bond as their bid guarantee, such bid bond must be accompanied by a power of attorney, which DFD will only accept as genuine if it is properly notarized. Wisconsin law permits the use of (electronic) remote online notarization if it is performed using technology providers that have been approved by the Department of Financial Institutions (DFI). If a bidder elects to use remote online notarization it is the responsibility of the bidder and its surety to ensure that the technology provider has been approved by DFI. DFD reserves the right to reject bids submitted electronically if a bidder uses a remote online notarization technology provider that has not been approved by DFI.

Bid forms containing electronic signatures must be obtained using approved software in order to be accepted. DocuSign software and Adobe Digital Signature software are approved for e-signatures for submission of bids.  Use of any other e-signature software will require additional verification and approval at least three (3) business days prior to submission of bids. Please contact doadfdmbidsubmission@wisconsin.gov regarding any proposed electronic signature software. Failure to obtain pre-approval may result in bid rejection.

Any email submissions should receive a reply.  If a reply is not received within thirty minutes after PDF bid is emailed, please contact DFD at (608) 266-7066 or (608) 261-7758.  Each bid package must be submitted in a separate email as a scanned PDF file of all required bid documents. Size limit is 20 MB per email. The email subject line must use the following format: “Project Number – Bid Category/Division of Work – Company Name".  Only PDF files will be accepted via email.  Bids and bid bond forms must be signed with original wet signatures or properly transmitted electronic signatures using a remote online notarization technology provider that have been approved by the Department of Financial Institutions (DFI), where required.  DFD will require the apparent low bidders to submit “hard copy" versions of their bid documents.  DFD may also require the other bidders to submit hard copy versions of bid documents before any contracts are initiated. Hard copy versions must be received within seven (7) days of request.

Awarded contracts may be signed via DocuSign. However, the contractor may still choose to print, sign, and mail paper contract. If a contractor chooses to sign contract and contract documents electronically via DocuSign, they must attach their remote notarized Performance Bond, Payment Bond, Power of Attorney, and Corporate Resolution using technology providers that have been approved by the Department of Financial Institutions (DFI), to the DocuSign envelope. This is the preferred method and more detailed instructions will be provided with contract offer correspondence.

All bids, regardless of delivery method, are due by 1:00 P.M. CDT on the day that the bid submission is due.  Bidders are responsible for the bid being delivered before the time specified and delivery is entirely at the bidder's risk.  Therefore, bidders are highly encouraged to use email PDF to submit bids. 

Bid openings will be conducted via Microsoft Teams. Bidders may call the Madison Microsoft Teams teleconference number: (608) 571-2209, 484 588 360# , on the day of the bid to hear the bid results announced on the day bids are due. The conference line will be open at 1:45 P.M. CDT and all bids will be opened after 2:00 P.M. CDT. All in-person bid openings have been discontinued.
 

This web page is an electronic listing of Dept. of Administration, Division of Facilities Development (DFD) construction projects being bid or for which proposals will be solicited in the near future.

The page is best viewed using Internet Explorer, as some functions may not work correctly if using other browser software.  

  • To view bidding documents click on the project title.
  • To view a DFD plan holders list, click on the “Plan Holders” link next to the project number.  Plan holders lists are provided as a courtesy, DFD is not responsible for any errors or inaccuracies. The plan holders lists do not necessarily reflect all possible bidders.
  • If a revised date is displayed under the project number, click on the underlined date to display a description of the revisions.
  • To view a list of projects already bid, including bid opening tabulations and construction contracts that have been issued, click on the 'Bid Results' link to the left.
  • Please note that an RSS feed of this page is available by clicking on the following icon Subscribe to RSS Feed
  • Notices of Proprietary Acquisition are located at the bottom of this page.   
 

List of Projects Out for Bid
Monday, Dec 11 2023
Project NumberPlans Available OnBid DateProject Title/Bid DocumentsAgency/Institution/BuildingA/EEstimate Construction CostProject ManagerPrebid Tour DatePrebid Tour Mandatory
19K2N GPC 12/7/2023
Plan Holders
2/7/2024 Elevator Modernization ADMINISTRATION/
ADMINISTRATIVE FACILITIES
/
STATE LABOR BLDG-GEF I
Aro Eberle Architects $2,845,500 Hoffmann 1/9/2024 No
18J2EREBID GPC 11/29/2023
Plan Holders
2/6/2024 North Point Improvements STATE FAIR PARK/
STATE FAIR PARK - WEST ALLIS
Vierbicher Associates, Inc. $3,500,000 Schaefer No
19K2P GPC 11/29/2023
Plan Holders
2/6/2024 Elevator Modernization ADMINISTRATION/
ADMINISTRATIVE FACILITIES
/
STATE ADMINISTRATION BLDG
Aro Eberle Architects $2,299,600 Hoffmann 12/21/2023 No
17I1K-03 GPC 12/5/2023
Plan Holders
2/1/2024 Immersive Welcome Experience, Phase 2 HISTORICAL SOCIETY/
OLD WORLD WISCONSIN ETHNIC OUTDOOR MUSEUM, EAGLE
/
MULTI - BUILDING
Aro Eberle Architects $5,400,000 Schaefer 12/19/2023 No
21L1UREBID GPC 11/20/2023
Plan Holders
2/1/2024 Elevator Upgrades CORRECTIONS/
CHIPPEWA VALLEY CORRECTIONAL TREATMENT FACILITY
Lien & Peterson Architects, Inc. $770,000 Hoffmann 12/21/2023 No
21G2A GPC 11/15/2023
Plan Holders
1/31/2024 Freezer Floor Replacement
Addenda to Date: 1
CORRECTIONS/
GREEN BAY CORRECTIONAL INSTITUTION
Somerville, Inc. $575,000 Zamzow 1/3/2024 No
22B3U GPC 11/3/2023
Plan Holders
1/31/2024 Construct Wildlife Shop Facility NATURAL RESOURCES/
VERNON WILDLIFE AREA
Angus Young Associates Inc $1,400,000 Schaefer 1/4/2024 No
22C2B GPC 11/15/2023
Plan Holders
1/30/2024 Lobby Hardening CORRECTIONS/
RACINE YOUTH OFFENDER CORRECTIONAL FACILITY
KonText Architects, LLC $700,000 Becker 12/11/2023 No
22L2FREBID
(Proposal)
12/8/2023
Plan Holders
1/30/2024 Heifer Research Barn Column Repair UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
/
ARS MARSHFIELD-N HEIFER RESEARCH BARN
DC Engineering, Inc. $55,000 Luttrell No
22C3JREBID GPC 11/29/2023
Plan Holders
1/25/2024 Shared Operations Facility NATURAL RESOURCES/
RICHARD BONG RECREATION AREA
Arc-Int Architecture $1,585,000 Hall 12/15/2023 No
22H1PREBID
(Proposal)
12/8/2023
Plan Holders
1/25/2024 Line of Sight Reconstruction UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
/
MULTI - BUILDING
Kimley-Horn and Associates, Inc. $75,000 Luttrell No
19K2N MEP 12/7/2023
Plan Holders
1/24/2024 Elevator Modernization ADMINISTRATION/
ADMINISTRATIVE FACILITIES
/
STATE LABOR BLDG-GEF I
Aro Eberle Architects $2,845,500 Hoffmann 1/9/2024 No
22E1C GPC 11/21/2023
Plan Holders
1/24/2024 Restaurant Renovation UNIVERSITY OF WISCONSIN/
OSHKOSH CAMPUS
/
SCOTT HALL
KonText Architects, LLC $711,700 Hall 12/19/2023 No
22H2J GPC 11/29/2023
Plan Holders
1/24/2024 Historic Bathhouse Renovation and Repair NATURAL RESOURCES/
PATTISON STATE PARK
/
RECREATION - BATHHOUSE
Cedar Corporation $443,600 Janus 12/14/2023 No
18J2EREBID MEP 11/29/2023
Plan Holders
1/23/2024 North Point Improvements STATE FAIR PARK/
STATE FAIR PARK - WEST ALLIS
Vierbicher Associates, Inc. $3,500,000 Schaefer No
19K2P MEP 11/29/2023
Plan Holders
1/23/2024 Elevator Modernization ADMINISTRATION/
ADMINISTRATIVE FACILITIES
/
STATE ADMINISTRATION BLDG
Aro Eberle Architects $2,299,600 Hoffmann 12/21/2023 No
21E2U-01 GPC 11/15/2023
Plan Holders
1/23/2024 Historic Home Renovation
GPC Only.
UNIVERSITY OF WISCONSIN/
OSHKOSH CAMPUS
/
MULTICULTURAL CENTER
InSite Consulting Architects, LLC $1,000,000 Schaefer 1/10/2024 No
22L2D-02 STC 11/20/2023
Plan Holders
1/23/2024 Backup Chilled Water Pump
STC - Mechanical
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
/
KOHL CENTER
Berners-Schober Associates, Inc. $95,000 Dapp 1/3/2024 No
23E3B
(Proposal)
11/29/2023
Plan Holders
1/23/2024 Roof Replacement TRANSPORTATION/
DSP - DISTRICT 7
/
DIST HDQ-SPOONER
Lien & Peterson Architects, Inc. $44,700 Zamzow 1/4/2024 No
17I1K-03 MEP 12/5/2023
Plan Holders
1/18/2024 Immersive Welcome Experience, Phase 2 HISTORICAL SOCIETY/
OLD WORLD WISCONSIN ETHNIC OUTDOOR MUSEUM, EAGLE
/
MULTI - BUILDING
Aro Eberle Architects $5,400,000 Schaefer 12/19/2023 No
21E4A STC 12/7/2023
Plan Holders
1/18/2024 Sound System Upgrades
Single Trade Contract - Electrical
ADMINISTRATION/
ADMINISTRATIVE FACILITIES
/
WISCONSIN STATE CAPITOL
Henneman Engineering, Inc. $1,120,000 Whitley 1/4/2024 No
21L1UREBID MEP 11/20/2023
Plan Holders
1/18/2024 Elevator Upgrades CORRECTIONS/
CHIPPEWA VALLEY CORRECTIONAL TREATMENT FACILITY
Lien & Peterson Architects, Inc. $770,000 Hoffmann 12/21/2023 No
22C4Y STC 11/30/2023
Plan Holders
1/18/2024 Fiber Optic Installation
STC - Electrical
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
/
UTILITY - ELECTRICAL
Mead & Hunt, Inc. $1,110,000 Lux 12/15/2023 No
23B1M
(Proposal)
12/7/2023
Plan Holders
1/18/2024 Entrance Vestibule Upgrades MILITARY AFFAIRS/
FORT MCCOY
/
MILITARY ACADEMY
KonText Architects, LLC $90,000 Luttrell No
21G2A MEP 11/15/2023
Plan Holders
1/17/2024 Freezer Floor Replacement
Addenda to Date: 1
CORRECTIONS/
GREEN BAY CORRECTIONAL INSTITUTION
Somerville, Inc. $575,000 Zamzow 1/3/2024 No
22B3U MEP 11/3/2023
Plan Holders
1/17/2024 Construct Wildlife Shop Facility NATURAL RESOURCES/
VERNON WILDLIFE AREA
Angus Young Associates Inc $1,400,000 Schaefer 1/4/2024 No
22C2B MEP 11/15/2023
Plan Holders
1/16/2024 Lobby Hardening CORRECTIONS/
RACINE YOUTH OFFENDER CORRECTIONAL FACILITY
KonText Architects, LLC $700,000 Becker 12/11/2023 No
22C3G GPC 11/16/2023
Plan Holders
1/16/2024 North Building Roof Replacement
GPC Only
HEALTH SERVICES/
WISCONSIN RESOURCE CENTER, WINNEBAGO
/
WIS RES CTR-NORTH
InSite Consulting Architects, LLC $2,178,000 Zamzow 1/3/2024 No
22I3I
(Proposal)
12/6/2023
Plan Holders
1/16/2024 AC Unit Replacement UNIVERSITY OF WISCONSIN/
WHITEWATER CAMPUS
/
STUDENT ATHLETIC COMPLEX
Henneman Engineering, Inc. $62,500 McGinnis 1/3/2024 No
21I2F STC 11/29/2023
Plan Holders
1/11/2024 Air Handling Unit Replacement
STC - Mechanical
HEALTH SERVICES/
CENTRAL WISCONSIN CENTER, MADISON
/
INFIRMARY G
Andhole Engineering LLC $2,055,000 McGinnis 12/20/2023 No
22H2D GPC 11/30/2023
Plan Holders
1/11/2024 Pulverize and Repave Southern Entrance Road
GPC Only
NATURAL RESOURCES/
PERROT STATE PARK
Kapur & Associates, Inc. $1,130,500 Yahnke No
21L3R GPC 12/1/2023
Plan Holders
1/10/2024 Area B Roof Replacement
GPC Only.
CORRECTIONS/
Wisconsin Secure Program Facility
Bloom Companies LLC $517,000 Yahnke No
22C3JREBID MEP 11/29/2023
Plan Holders
1/10/2024 Shared Operations Facility NATURAL RESOURCES/
RICHARD BONG RECREATION AREA
Arc-Int Architecture $1,585,000 Hall 12/15/2023 No
21L3QREBID GPC 11/16/2023
Plan Holders
1/9/2024 Unit 4 Roof Replacement
GPC Only.
CORRECTIONS/
STANLEY CORRECTIONAL INSTITUTION, STANLEY
Lien & Peterson Architects, Inc. $592,000 Hoffmann 12/18/2023 No
22E1C MEP 11/21/2023
Plan Holders
1/9/2024 Restaurant Renovation UNIVERSITY OF WISCONSIN/
OSHKOSH CAMPUS
/
SCOTT HALL
KonText Architects, LLC $711,700 Hall 12/19/2023 No
22H2J MEP 11/29/2023
Plan Holders
1/9/2024 Historic Bathhouse Renovation and Repair NATURAL RESOURCES/
PATTISON STATE PARK
/
RECREATION - BATHHOUSE
Cedar Corporation $443,600 Janus 12/14/2023 No
19I2Q GPC
Revised

11/30/2023
10/26/2023
Plan Holders
12/21/2023 New Health Services Unit
FP Rebid 12/7/2023. GPC moved to 12/21/2023.

Addenda to Date: 3
CORRECTIONS/
STANLEY CORRECTIONAL INSTITUTION, STANLEY
Mead & Hunt, Inc. $11,419,000 Balciunas 11/14/2023 No
20J1K GPC 10/27/2023
Plan Holders
12/21/2023 Fire Suppression System Replacement
Addenda to Date: 1
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
/
STOVALL-STATE HYGIENE LAB
Salas O’Brien North, LLC $900,000 Coddington 11/16/2023 No
21F1S GPC 10/11/2023
Plan Holders
12/21/2023 Parking Lot Construction UNIVERSITY OF WISCONSIN/
PARKSIDE CAMPUS
CEDP, Inc. $412,400 Hall No
22D2S GPC
Revised

11/30/2023
10/17/2023
Plan Holders
12/21/2023 AHU and Air Distribution System Upgrade
GPC Bidding rescheduled to 12/21/23 per Add. 2

Addenda to Date: 2
ADMINISTRATION/
ADMINISTRATIVE FACILITIES
/
GREEN BAY STATE OFFICE BLDG
Andhole Engineering LLC $1,910,000 Crawford 11/8/2023 No
23A1K GPC 11/30/2023
Plan Holders
12/21/2023 Track Safety Improvements Phase 2
GPC Only, Less than 30 Bidding Days
STATE FAIR PARK/
STATE FAIR PARK - WEST ALLIS
Venture Architects $2,250,000 Shumaker 12/5/2023 No
18K2M-01 GPC 11/13/2023
Plan Holders
12/20/2023 Phase 1 - Site Demolition
GPC Only.
CORRECTIONS/
VARIOUS
BWBR Architects, Inc. $495,000 Hoffmann 11/28/2023 No
20J1T GPC 11/2/2023
Plan Holders
12/20/2023 Parking Ramp and Building Addition
Addenda to Date: 1
UNIVERSITY OF WISCONSIN/
LA CROSSE CAMPUS
GRAEF $21,452,000 Yahnke 11/15/2023 No
21K3JREBID2 GPC 11/9/2023
Plan Holders
12/20/2023 Envelope Repairs
GPC Only
HEALTH SERVICES/
WISCONSIN RESOURCE CENTER, WINNEBAGO
/
WIS RES CTR-NORTH
KonText Architects, LLC $1,327,200 Quilling 12/5/2023 No
17I1K-04 GPC
Revised

11/21/2023
9/20/2023
Plan Holders
12/19/2023 Tavern Renovations
GPC Bid Date moved to 12/19/23 per Add 3

Addenda to Date: 3
HISTORICAL SOCIETY/
OLD WORLD WISCONSIN ETHNIC OUTDOOR MUSEUM, EAGLE
Aro Eberle Architects $950,000 Schaefer 10/25/2023 No
19K2J-02 GPC 10/27/2023
Plan Holders
12/19/2023 Water System Upgrades
Addenda to Date: 1
CORRECTIONS/
MCNAUGHTON CORR. CENTER AND FARM, LAKE TOMAHAWK
/
MULTI - BUILDING
Ayres Associates, Inc. $650,000 Kolaszewski 11/16/2023 No
22B2W GPC
Revised

12/7/2023
10/11/2023
Plan Holders
12/19/2023 Bathroom and Entrance Remodel
Bidding for this project has been cancelled

Addenda to Date: 1
TRANSPORTATION/
DMV - DISTRICT 8
/
DMV SVC CTR-MILWAUKEE SOUTH
Dimension IV Madison Design Group $305,000 Becker No
22C4R GPC 11/10/2023
Plan Holders
12/19/2023 Food Service Roof Replacement
GPC Only.
CORRECTIONS/
FOX LAKE CORRECTIONAL INSTITUTION, FOX LAKE
Specialty Engineering Group LLC $1,695,000 Becker 11/20/2023 No
22K1R
(Proposal)
11/7/2023
Plan Holders
12/19/2023 Exterior Door Replacement UNIVERSITY OF WISCONSIN/
STEVENS POINT CAMPUS
/
SCIENCE BUILDING
Cedar Corporation $215,700 Quilling 12/6/2023 No
22J3GREBID2
(Proposal)
11/8/2023
Plan Holders
12/14/2023 Roof and Coping Repairs UNIVERSITY OF WISCONSIN/
STOUT CAMPUS
/
MULTI - BUILDING
Cedar Corporation $153,200 Quilling 11/30/2023 No
21F1E
(Proposal)
11/3/2023
Plan Holders
12/13/2023 East Entry Structural Improvements HISTORICAL SOCIETY/
HISTORICAL SOCIETY, MADISON
/
HISTORICAL LIBRARY & OFFICES
GRAEF $80,000 Wenzel 11/27/2023 No
22B3LREBID GPC 10/20/2023
Plan Holders
12/13/2023 Shower Replacements
Addenda to Date: 2
UNIVERSITY OF WISCONSIN/
STOUT CAMPUS
/
RED CEDAR HALL
Cedar Corporation $767,400 Wenzel 11/14/2023 No
22I2K GPC 10/17/2023
Plan Holders
12/13/2023 Twin Valley Boat Launch Renovation
GPC Only
NATURAL RESOURCES/
GOVERNOR DODGE STATE PARK
Kapur & Associates, Inc. $335,000 Hall No
22I3E GPC 11/6/2023
Plan Holders
12/13/2023 Titan Stadium Track Replacement
GPC Only.
UNIVERSITY OF WISCONSIN/
OSHKOSH CAMPUS
/
TITAN STADIUM
Rettler Corporation $1,257,000 Janus 11/21/2023 No
18K2S-03REBID2 GPC 10/18/2023
Plan Holders
12/12/2023 Systems Repair
GPC Only.
UNIVERSITY OF WISCONSIN/
WHITEWATER CAMPUS
/
CENTRAL HEATING PLANT
Ring & DuChateau, LLP $320,000 Otremba No
21L2P
(Proposal)
11/8/2023
Plan Holders
12/12/2023 Paver Roof Replacement UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
/
ELIZABETH WATERS HALL
Building Envelope Professionals Group LLC $77,400 Kirchstein 11/27/2023 No



Notices of Proprietary Acquisition
Monday, Dec 11 2023
Project NumberProject TitleAgency Name/InstitutionWork ByNotice DateContract Execution DateProject Manager
19F2Y-04 Camp Randall Stadium Renovation UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
Johnson Controls, Inc.3/30/20235/2/2024 Luttrell
19I2Q New Health Services Unit CORRECTIONS/
STANLEY CORRECTIONAL INSTITUTION, STANLEY
Trane Company10/30/202312/19/2023 Balciunas
21I2F Air Handling Unit Replacement HEALTH SERVICES/
CENTRAL WISCONSIN CENTER, MADISON
Johnson Controls, Inc.11/30/20241/18/2024 McGinnis
21G2A Freezer Floor Replacement CORRECTIONS/
GREEN BAY CORRECTIONAL INSTITUTION
Energy Control & Design, Inc.11/21/20232/7/2024 Zamzow
22L2D-02 Athletics Facility Repairs and Renovations UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
Johnson Controls, Inc.11/21/20231/30/2024 Dapp
22E1C Restaurant Renovation UNIVERSITY OF WISCONSIN/
OSHKOSH CAMPUS
Johnson Controls, Inc.11/22/20231/31/2024 Hall
20J1T Parking Ramp and Building Addition UNIVERSITY OF WISCONSIN/
LA CROSSE CAMPUS
North American Mechanical, Inc.11/27/202312/27/2023 Yahnke