Bid Results
|
IMPORTANT NEWS & UPDATES:
THE DIVISION OF FACILITIES DEVELOPMENT (DFD) WILL NOW BE ACCEPTING CONSTRUCTION BIDDING DOCUMENTS FOR BID OPENINGS IN MADISON, WI AS FOLLOWS:
- PDF scanned file of all required bid documents, including bid and bid bond forms with original wet signatures or properly transmitted electronic signatures
(only PDF files will be accepted) emailed to doadfdmbidsubmission@wisconsin.gov (this is the preferred method);
- US Mail (United States Postal Service) or Third-pardy delivery (UPS, Fedex, or DHL) to the State of Wisconsin Administration Building; or
- Hand delivery to the drop box labeled SEALED BIDS ONLY in front of the State of Wisconsin Administration Building located at 101 East Wilson Street, Madison, Wisconsin 53703.
IN ADDITION, DFD WILL NOW ALSO ACCEPT THE FOLLOWING FOR ALL CONSTRUCTION BIDDING DOCUMENTS:
- PDF files with electronic signatures using a remote online signature or notarization technology provider (approved providers only). Electronic signatures must also be accompanied by telephone numbers for all signatories as well as the bond principal and issuing surety on bond documents for oral verification (only PDF files will be accepted) emailed to doadfdmbidsubmission@wisconsin.gov (this is the preferred method).
In order to ensure that bids are received and processed, ALL must be delivered by 1:00 P.M. CDT on the day that the bid submission is due REGARDLESS OF DELIVERY METHOD.
Bidders may submit PDFs of bid forms, bonds, and powers of attorney containing e-signatures, e-corporate seals, and e-notaries affixed to each document in accordance with the Surety’s obligations. We will require telephone numbers for all signatories as well as the bond principal and issuing surety for oral verification. Bids must be accompanied by a bid guarantee, which may take the form of a properly executed DFD form of bid bond. If a bidder elects to use a bid bond as their bid guarantee, such bid bond must be accompanied by a power of attorney, which DFD will only accept as genuine if it is properly notarized. Wisconsin law permits the use of (electronic) remote online notarization if it is performed using technology providers that have been approved by the Department of Financial Institutions (DFI). If a bidder elects to use remote online notarization it is the responsibility of the bidder and its surety to ensure that the technology provider has been approved by DFI. DFD reserves the right to reject bids submitted electronically if a bidder uses a remote online notarization technology provider that has not been approved by DFI.
Bid forms containing electronic signatures must be obtained using approved software in order to be accepted. DocuSign software and Adobe Digital Signature software are approved for e-signatures for submission of bids. Use of any other e-signature software will require additional verification and approval at least three (3) business days prior to submission of bids. Please contact doadfdmbidsubmission@wisconsin.gov regarding any proposed electronic signature software. Failure to obtain pre-approval may result in bid rejection.
Any email submissions should receive a reply. If a reply is not received within thirty minutes after PDF bid is emailed, please contact DFD at (608) 266-7066 or (608) 261-7758. Each bid package must be submitted in a separate email as a scanned PDF file of all required bid documents. Size limit is 20 MB per email. The email subject line must use the following format: “Project Number – Bid Category/Division of Work – Company Name". Only PDF files will be accepted via email. Bids and bid bond forms must be signed with original wet signatures or properly transmitted electronic signatures using a remote online notarization technology provider that have been approved by the Department of Financial Institutions (DFI), where required. DFD will require the apparent low bidders to submit “hard copy" versions of their bid documents. DFD may also require the other bidders to submit hard copy versions of bid documents before any contracts are initiated. Hard copy versions must be received within seven (7) days of request.
Awarded contracts may be signed via DocuSign. However, the contractor may still choose to print, sign, and mail paper contract. If a contractor chooses to sign contract and contract documents electronically via DocuSign, they must attach their remote notarized Performance Bond, Payment Bond, Power of Attorney, and Corporate Resolution using technology providers that have been approved by the Department of Financial Institutions (DFI), to the DocuSign envelope. This is the preferred method and more detailed instructions will be provided with contract offer correspondence.
All bids, regardless of delivery method, are due by 1:00 P.M. CDT on the day that the bid submission is due. Bidders are responsible for the bid being delivered before the time specified and delivery is entirely at the bidder's risk. Therefore, bidders are highly encouraged to use email PDF to submit bids.
Bid openings will be conducted via Microsoft Teams. Bidders may call the Madison Microsoft Teams teleconference number: (608) 571-2209, 484 588 360# , on the day of the bid to hear the bid results announced on the day bids are due. The conference line will be open at 1:45 P.M. CDT and all bids will be opened after 2:00 P.M. CDT. All in-person bid openings have been discontinued.
This web page is an electronic listing of Dept. of Administration, Division of Facilities Development (DFD) construction projects being bid or for which proposals will be solicited in the near future.
The page is best viewed using Internet Explorer, as some functions may not work correctly if using other browser software.
- To view bidding documents click on the project title.
- To view a DFD plan holders list, click on the “Plan Holders” link next to the project number. Plan holders lists are provided as a courtesy, DFD is not responsible for any errors or inaccuracies. The plan holders lists do not necessarily reflect all possible bidders.
- If a revised date is displayed under the project number, click on the underlined date to display a description of the revisions.
- To view a list of projects already bid, including bid opening tabulations and construction contracts that have been issued, click on the 'Bid Results' link to the left.
- Please note that an RSS feed of this page is available by clicking on the following icon
- Notices of Proprietary Acquisition are located at the bottom of this page.
|
|
List of Projects Out for Bid Monday, Dec 11 2023
Project Number | Plans Available On | Bid Date | Project Title/Bid Documents | Agency/Institution/Building | A/E | Estimate Construction Cost | Project Manager | Prebid Tour Date | Prebid Tour Mandatory |
19K2N GPC
|
12/7/2023
Plan Holders
|
2/7/2024
|
Elevator Modernization
|
ADMINISTRATION/
ADMINISTRATIVE FACILITIES
/STATE LABOR BLDG-GEF I
|
Aro Eberle Architects
|
$2,845,500
|
Hoffmann
|
1/9/2024
| No |
18J2EREBID GPC
|
11/29/2023
Plan Holders
|
2/6/2024
|
North Point Improvements
|
STATE FAIR PARK/
STATE FAIR PARK - WEST ALLIS
|
Vierbicher Associates, Inc.
|
$3,500,000
|
Schaefer
|
| No |
19K2P GPC
|
11/29/2023
Plan Holders
|
2/6/2024
|
Elevator Modernization
|
ADMINISTRATION/
ADMINISTRATIVE FACILITIES
/STATE ADMINISTRATION BLDG
|
Aro Eberle Architects
|
$2,299,600
|
Hoffmann
|
12/21/2023
| No |
17I1K-03 GPC
|
12/5/2023
Plan Holders
|
2/1/2024
|
Immersive Welcome Experience, Phase 2
|
HISTORICAL SOCIETY/
OLD WORLD WISCONSIN ETHNIC OUTDOOR MUSEUM, EAGLE
/MULTI - BUILDING
|
Aro Eberle Architects
|
$5,400,000
|
Schaefer
|
12/19/2023
| No |
21L1UREBID GPC
|
11/20/2023
Plan Holders
|
2/1/2024
|
Elevator Upgrades
|
CORRECTIONS/
CHIPPEWA VALLEY CORRECTIONAL TREATMENT FACILITY
|
Lien & Peterson Architects, Inc.
|
$770,000
|
Hoffmann
|
12/21/2023
| No |
21G2A GPC
|
11/15/2023
Plan Holders
|
1/31/2024
|
Freezer Floor Replacement
Addenda to Date: 1
|
CORRECTIONS/
GREEN BAY CORRECTIONAL INSTITUTION
|
Somerville, Inc.
|
$575,000
|
Zamzow
|
1/3/2024
| No |
22B3U GPC
|
11/3/2023
Plan Holders
|
1/31/2024
|
Construct Wildlife Shop Facility
|
NATURAL RESOURCES/
VERNON WILDLIFE AREA
|
Angus Young Associates Inc
|
$1,400,000
|
Schaefer
|
1/4/2024
| No |
22C2B GPC
|
11/15/2023
Plan Holders
|
1/30/2024
|
Lobby Hardening
|
CORRECTIONS/
RACINE YOUTH OFFENDER CORRECTIONAL FACILITY
|
KonText Architects, LLC
|
$700,000
|
Becker
|
12/11/2023
| No |
22L2FREBID
(Proposal)
|
12/8/2023
Plan Holders
|
1/30/2024
|
Heifer Research Barn Column Repair
|
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
/ARS MARSHFIELD-N HEIFER RESEARCH BARN
|
DC Engineering, Inc.
|
$55,000
|
Luttrell
|
| No |
22C3JREBID GPC
|
11/29/2023
Plan Holders
|
1/25/2024
|
Shared Operations Facility
|
NATURAL RESOURCES/
RICHARD BONG RECREATION AREA
|
Arc-Int Architecture
|
$1,585,000
|
Hall
|
12/15/2023
| No |
22H1PREBID
(Proposal)
|
12/8/2023
Plan Holders
|
1/25/2024
|
Line of Sight Reconstruction
|
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
/MULTI - BUILDING
|
Kimley-Horn and Associates, Inc.
|
$75,000
|
Luttrell
|
| No |
19K2N MEP
|
12/7/2023
Plan Holders
|
1/24/2024
|
Elevator Modernization
|
ADMINISTRATION/
ADMINISTRATIVE FACILITIES
/STATE LABOR BLDG-GEF I
|
Aro Eberle Architects
|
$2,845,500
|
Hoffmann
|
1/9/2024
| No |
22E1C GPC
|
11/21/2023
Plan Holders
|
1/24/2024
|
Restaurant Renovation
|
UNIVERSITY OF WISCONSIN/
OSHKOSH CAMPUS
/SCOTT HALL
|
KonText Architects, LLC
|
$711,700
|
Hall
|
12/19/2023
| No |
22H2J GPC
|
11/29/2023
Plan Holders
|
1/24/2024
|
Historic Bathhouse Renovation and Repair
|
NATURAL RESOURCES/
PATTISON STATE PARK
/RECREATION - BATHHOUSE
|
Cedar Corporation
|
$443,600
|
Janus
|
12/14/2023
| No |
18J2EREBID MEP
|
11/29/2023
Plan Holders
|
1/23/2024
|
North Point Improvements
|
STATE FAIR PARK/
STATE FAIR PARK - WEST ALLIS
|
Vierbicher Associates, Inc.
|
$3,500,000
|
Schaefer
|
| No |
19K2P MEP
|
11/29/2023
Plan Holders
|
1/23/2024
|
Elevator Modernization
|
ADMINISTRATION/
ADMINISTRATIVE FACILITIES
/STATE ADMINISTRATION BLDG
|
Aro Eberle Architects
|
$2,299,600
|
Hoffmann
|
12/21/2023
| No |
21E2U-01 GPC
|
11/15/2023
Plan Holders
|
1/23/2024
|
Historic Home Renovation
GPC Only.
|
UNIVERSITY OF WISCONSIN/
OSHKOSH CAMPUS
/MULTICULTURAL CENTER
|
InSite Consulting Architects, LLC
|
$1,000,000
|
Schaefer
|
1/10/2024
| No |
22L2D-02 STC
|
11/20/2023
Plan Holders
|
1/23/2024
|
Backup Chilled Water Pump
STC - Mechanical
|
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
/KOHL CENTER
|
Berners-Schober Associates, Inc.
|
$95,000
|
Dapp
|
1/3/2024
| No |
23E3B
(Proposal)
|
11/29/2023
Plan Holders
|
1/23/2024
|
Roof Replacement
|
TRANSPORTATION/
DSP - DISTRICT 7
/DIST HDQ-SPOONER
|
Lien & Peterson Architects, Inc.
|
$44,700
|
Zamzow
|
1/4/2024
| No |
17I1K-03 MEP
|
12/5/2023
Plan Holders
|
1/18/2024
|
Immersive Welcome Experience, Phase 2
|
HISTORICAL SOCIETY/
OLD WORLD WISCONSIN ETHNIC OUTDOOR MUSEUM, EAGLE
/MULTI - BUILDING
|
Aro Eberle Architects
|
$5,400,000
|
Schaefer
|
12/19/2023
| No |
21E4A STC
|
12/7/2023
Plan Holders
|
1/18/2024
|
Sound System Upgrades
Single Trade Contract - Electrical
|
ADMINISTRATION/
ADMINISTRATIVE FACILITIES
/WISCONSIN STATE CAPITOL
|
Henneman Engineering, Inc.
|
$1,120,000
|
Whitley
|
1/4/2024
| No |
21L1UREBID MEP
|
11/20/2023
Plan Holders
|
1/18/2024
|
Elevator Upgrades
|
CORRECTIONS/
CHIPPEWA VALLEY CORRECTIONAL TREATMENT FACILITY
|
Lien & Peterson Architects, Inc.
|
$770,000
|
Hoffmann
|
12/21/2023
| No |
22C4Y STC
|
11/30/2023
Plan Holders
|
1/18/2024
|
Fiber Optic Installation
STC - Electrical
|
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
/UTILITY - ELECTRICAL
|
Mead & Hunt, Inc.
|
$1,110,000
|
Lux
|
12/15/2023
| No |
23B1M
(Proposal)
|
12/7/2023
Plan Holders
|
1/18/2024
|
Entrance Vestibule Upgrades
|
MILITARY AFFAIRS/
FORT MCCOY
/MILITARY ACADEMY
|
KonText Architects, LLC
|
$90,000
|
Luttrell
|
| No |
21G2A MEP
|
11/15/2023
Plan Holders
|
1/17/2024
|
Freezer Floor Replacement
Addenda to Date: 1
|
CORRECTIONS/
GREEN BAY CORRECTIONAL INSTITUTION
|
Somerville, Inc.
|
$575,000
|
Zamzow
|
1/3/2024
| No |
22B3U MEP
|
11/3/2023
Plan Holders
|
1/17/2024
|
Construct Wildlife Shop Facility
|
NATURAL RESOURCES/
VERNON WILDLIFE AREA
|
Angus Young Associates Inc
|
$1,400,000
|
Schaefer
|
1/4/2024
| No |
22C2B MEP
|
11/15/2023
Plan Holders
|
1/16/2024
|
Lobby Hardening
|
CORRECTIONS/
RACINE YOUTH OFFENDER CORRECTIONAL FACILITY
|
KonText Architects, LLC
|
$700,000
|
Becker
|
12/11/2023
| No |
22C3G GPC
|
11/16/2023
Plan Holders
|
1/16/2024
|
North Building Roof Replacement
GPC Only
|
HEALTH SERVICES/
WISCONSIN RESOURCE CENTER, WINNEBAGO
/WIS RES CTR-NORTH
|
InSite Consulting Architects, LLC
|
$2,178,000
|
Zamzow
|
1/3/2024
| No |
22I3I
(Proposal)
|
12/6/2023
Plan Holders
|
1/16/2024
|
AC Unit Replacement
|
UNIVERSITY OF WISCONSIN/
WHITEWATER CAMPUS
/STUDENT ATHLETIC COMPLEX
|
Henneman Engineering, Inc.
|
$62,500
|
McGinnis
|
1/3/2024
| No |
21I2F STC
|
11/29/2023
Plan Holders
|
1/11/2024
|
Air Handling Unit Replacement
STC - Mechanical
|
HEALTH SERVICES/
CENTRAL WISCONSIN CENTER, MADISON
/INFIRMARY G
|
Andhole Engineering LLC
|
$2,055,000
|
McGinnis
|
12/20/2023
| No |
22H2D GPC
|
11/30/2023
Plan Holders
|
1/11/2024
|
Pulverize and Repave Southern Entrance Road
GPC Only
|
NATURAL RESOURCES/
PERROT STATE PARK
|
Kapur & Associates, Inc.
|
$1,130,500
|
Yahnke
|
| No |
21L3R GPC
|
12/1/2023
Plan Holders
|
1/10/2024
|
Area B Roof Replacement
GPC Only.
|
CORRECTIONS/
Wisconsin Secure Program Facility
|
Bloom Companies LLC
|
$517,000
|
Yahnke
|
| No |
22C3JREBID MEP
|
11/29/2023
Plan Holders
|
1/10/2024
|
Shared Operations Facility
|
NATURAL RESOURCES/
RICHARD BONG RECREATION AREA
|
Arc-Int Architecture
|
$1,585,000
|
Hall
|
12/15/2023
| No |
21L3QREBID GPC
|
11/16/2023
Plan Holders
|
1/9/2024
|
Unit 4 Roof Replacement
GPC Only.
|
CORRECTIONS/
STANLEY CORRECTIONAL INSTITUTION, STANLEY
|
Lien & Peterson Architects, Inc.
|
$592,000
|
Hoffmann
|
12/18/2023
| No |
22E1C MEP
|
11/21/2023
Plan Holders
|
1/9/2024
|
Restaurant Renovation
|
UNIVERSITY OF WISCONSIN/
OSHKOSH CAMPUS
/SCOTT HALL
|
KonText Architects, LLC
|
$711,700
|
Hall
|
12/19/2023
| No |
22H2J MEP
|
11/29/2023
Plan Holders
|
1/9/2024
|
Historic Bathhouse Renovation and Repair
|
NATURAL RESOURCES/
PATTISON STATE PARK
/RECREATION - BATHHOUSE
|
Cedar Corporation
|
$443,600
|
Janus
|
12/14/2023
| No |
19I2Q GPC
Revised
11/30/2023
|
10/26/2023
Plan Holders
|
12/21/2023
|
New Health Services Unit
FP Rebid 12/7/2023. GPC moved to 12/21/2023.
Addenda to Date: 3
|
CORRECTIONS/
STANLEY CORRECTIONAL INSTITUTION, STANLEY
|
Mead & Hunt, Inc.
|
$11,419,000
|
Balciunas
|
11/14/2023
| No |
20J1K GPC
|
10/27/2023
Plan Holders
|
12/21/2023
|
Fire Suppression System Replacement
Addenda to Date: 1
|
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
/STOVALL-STATE HYGIENE LAB
|
Salas O’Brien North, LLC
|
$900,000
|
Coddington
|
11/16/2023
| No |
21F1S GPC
|
10/11/2023
Plan Holders
|
12/21/2023
|
Parking Lot Construction
|
UNIVERSITY OF WISCONSIN/
PARKSIDE CAMPUS
|
CEDP, Inc.
|
$412,400
|
Hall
|
| No |
22D2S GPC
Revised
11/30/2023
|
10/17/2023
Plan Holders
|
12/21/2023
|
AHU and Air Distribution System Upgrade
GPC Bidding rescheduled to 12/21/23 per Add. 2
Addenda to Date: 2
|
ADMINISTRATION/
ADMINISTRATIVE FACILITIES
/GREEN BAY STATE OFFICE BLDG
|
Andhole Engineering LLC
|
$1,910,000
|
Crawford
|
11/8/2023
| No |
23A1K GPC
|
11/30/2023
Plan Holders
|
12/21/2023
|
Track Safety Improvements Phase 2
GPC Only, Less than 30 Bidding Days
|
STATE FAIR PARK/
STATE FAIR PARK - WEST ALLIS
|
Venture Architects
|
$2,250,000
|
Shumaker
|
12/5/2023
| No |
18K2M-01 GPC
|
11/13/2023
Plan Holders
|
12/20/2023
|
Phase 1 - Site Demolition
GPC Only.
|
CORRECTIONS/
VARIOUS
|
BWBR Architects, Inc.
|
$495,000
|
Hoffmann
|
11/28/2023
| No |
20J1T GPC
|
11/2/2023
Plan Holders
|
12/20/2023
|
Parking Ramp and Building Addition
Addenda to Date: 1
|
UNIVERSITY OF WISCONSIN/
LA CROSSE CAMPUS
|
GRAEF
|
$21,452,000
|
Yahnke
|
11/15/2023
| No |
21K3JREBID2 GPC
|
11/9/2023
Plan Holders
|
12/20/2023
|
Envelope Repairs
GPC Only
|
HEALTH SERVICES/
WISCONSIN RESOURCE CENTER, WINNEBAGO
/WIS RES CTR-NORTH
|
KonText Architects, LLC
|
$1,327,200
|
Quilling
|
12/5/2023
| No |
17I1K-04 GPC
Revised
11/21/2023
|
9/20/2023
Plan Holders
|
12/19/2023
|
Tavern Renovations
GPC Bid Date moved to 12/19/23 per Add 3
Addenda to Date: 3
|
HISTORICAL SOCIETY/
OLD WORLD WISCONSIN ETHNIC OUTDOOR MUSEUM, EAGLE
|
Aro Eberle Architects
|
$950,000
|
Schaefer
|
10/25/2023
| No |
19K2J-02 GPC
|
10/27/2023
Plan Holders
|
12/19/2023
|
Water System Upgrades
Addenda to Date: 1
|
CORRECTIONS/
MCNAUGHTON CORR. CENTER AND FARM, LAKE TOMAHAWK
/MULTI - BUILDING
|
Ayres Associates, Inc.
|
$650,000
|
Kolaszewski
|
11/16/2023
| No |
22B2W GPC
Revised
12/7/2023
|
10/11/2023
Plan Holders
|
12/19/2023
|
Bathroom and Entrance Remodel
Bidding for this project has been cancelled
Addenda to Date: 1
|
TRANSPORTATION/
DMV - DISTRICT 8
/DMV SVC CTR-MILWAUKEE SOUTH
|
Dimension IV Madison Design Group
|
$305,000
|
Becker
|
| No |
22C4R GPC
|
11/10/2023
Plan Holders
|
12/19/2023
|
Food Service Roof Replacement
GPC Only.
|
CORRECTIONS/
FOX LAKE CORRECTIONAL INSTITUTION, FOX LAKE
|
Specialty Engineering Group LLC
|
$1,695,000
|
Becker
|
11/20/2023
| No |
22K1R
(Proposal)
|
11/7/2023
Plan Holders
|
12/19/2023
|
Exterior Door Replacement
|
UNIVERSITY OF WISCONSIN/
STEVENS POINT CAMPUS
/SCIENCE BUILDING
|
Cedar Corporation
|
$215,700
|
Quilling
|
12/6/2023
| No |
22J3GREBID2
(Proposal)
|
11/8/2023
Plan Holders
|
12/14/2023
|
Roof and Coping Repairs
|
UNIVERSITY OF WISCONSIN/
STOUT CAMPUS
/MULTI - BUILDING
|
Cedar Corporation
|
$153,200
|
Quilling
|
11/30/2023
| No |
21F1E
(Proposal)
|
11/3/2023
Plan Holders
|
12/13/2023
|
East Entry Structural Improvements
|
HISTORICAL SOCIETY/
HISTORICAL SOCIETY, MADISON
/HISTORICAL LIBRARY & OFFICES
|
GRAEF
|
$80,000
|
Wenzel
|
11/27/2023
| No |
22B3LREBID GPC
|
10/20/2023
Plan Holders
|
12/13/2023
|
Shower Replacements
Addenda to Date: 2
|
UNIVERSITY OF WISCONSIN/
STOUT CAMPUS
/RED CEDAR HALL
|
Cedar Corporation
|
$767,400
|
Wenzel
|
11/14/2023
| No |
22I2K GPC
|
10/17/2023
Plan Holders
|
12/13/2023
|
Twin Valley Boat Launch Renovation
GPC Only
|
NATURAL RESOURCES/
GOVERNOR DODGE STATE PARK
|
Kapur & Associates, Inc.
|
$335,000
|
Hall
|
| No |
22I3E GPC
|
11/6/2023
Plan Holders
|
12/13/2023
|
Titan Stadium Track Replacement
GPC Only.
|
UNIVERSITY OF WISCONSIN/
OSHKOSH CAMPUS
/TITAN STADIUM
|
Rettler Corporation
|
$1,257,000
|
Janus
|
11/21/2023
| No |
18K2S-03REBID2 GPC
|
10/18/2023
Plan Holders
|
12/12/2023
|
Systems Repair
GPC Only.
|
UNIVERSITY OF WISCONSIN/
WHITEWATER CAMPUS
/CENTRAL HEATING PLANT
|
Ring & DuChateau, LLP
|
$320,000
|
Otremba
|
| No |
21L2P
(Proposal)
|
11/8/2023
Plan Holders
|
12/12/2023
|
Paver Roof Replacement
|
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
/ELIZABETH WATERS HALL
|
Building Envelope Professionals Group LLC
|
$77,400
|
Kirchstein
|
11/27/2023
| No |
|