Project Bidding - Listing of Projects Previously Out for Bid
Between Thursday, Mar 2 2023 and Friday, Jun 2 2023
Project Number | Bid Date | Project Title | Agency/Institution | A/E | Estimate Construction Cost | Project Manager | Prebid Tour Date | Prebid Tour Mandatory |
13D2J-01 STC
|
|
Grease Interceptor and Sanitary Sewer Improvements
Single Trade Contract - Plumbing
|
CORRECTIONS/
FOX LAKE CORRECTIONAL INSTITUTION, FOX LAKE
|
Town & Country Engineering, Inc.
|
$280,000
|
Kalscheur
|
5/10/2023
| No |
21G1T GPC
|
|
Replace Roof
GPC Only
|
MILITARY AFFAIRS/
FORT MCCOY
|
Facility Engineering, Inc.
|
$746,100
|
Wenzel
|
5/16/2023
| No |
22A2G GPC
|
|
Glazing Replacement
GPC Only
|
ADMINISTRATION/
ADMINISTRATIVE FACILITIES
|
Specialty Engineering Group LLC
|
$1,940,000
|
List
|
5/18/2023
| No |
23A2J
(Proposal)
|
|
Stack Repairs
|
PUBLIC INSTRUCTION/
SCHOOL FOR THE DEAF, DELAVAN
|
Larson Engineering, Inc.
|
$90,000
|
Jansen
|
| No |
23A2K
(Proposal)
|
|
Stack Repairs
|
PUBLIC INSTRUCTION/
SCHOOL FOR THE VISUALLY HANDICAPPED
|
Larson Engineering, Inc.
|
$90,000
|
Jansen
|
| No |
19F3F
(Proposal)
|
|
Fire and Security Alarm System Replacement
|
HISTORICAL SOCIETY/
STATE FARM AND CRAFT MUSEUM, CASSVILLE
|
JDR Engineering, Inc.
|
$215,000
|
Ewing
|
5/15/2023
| No |
22E2R
(Proposal)
|
|
Lakewood Tower Repair
|
TRANSPORTATION/
DSP - DISTRICT 1
|
Edge Consulting Engineers, Inc.
|
$60,000
|
Kolaszewski
|
| No |
22H2Z
(Proposal)
|
|
4A Wing HVAC Equipment Replacement
|
HEALTH SERVICES/
WISCONSIN RESOURCE CENTER, WINNEBAGO
|
Grumman/Butkus Associates, Ltd.
|
$196,900
|
Pearce
|
5/16/2023
| No |
21A3J MEP
|
|
Bathroom and Program Space Remodel
|
HEALTH SERVICES/
SOUTHERN WISCONSIN CENTER, UNION GROVE
|
OPN Architects, Inc.
|
$1,829,000
|
Janus
|
5/16/2023
| No |
21I2Z
(Proposal)
|
|
Lightning Protection
|
CORRECTIONS/
RACINE YOUTH OFFENDER CORRECTIONAL FACILITY
|
Leedy & Petzold Associates LLC
|
$230,000
|
Ewing
|
5/16/2023
| No |
22B2TREBID
(Proposal)
|
|
Unit D Door Controls Upgrade
|
CORRECTIONS/
ROBERT ELLSWORTH CORRECTIONAL CENTER, UNION GROVE
|
Powrtek Engineering, Inc.
|
$215,000
|
Stehly
|
| No |
21J1Q GPC
|
|
Rotunda Plaster and Decor Finish Ceiling Panel Restoration
GPC Only
|
ADMINISTRATION/
ADMINISTRATIVE FACILITIES
|
InSite Consulting Architects, LLC
|
$475,400
|
List
|
5/4/2023
5/9/2023
| Yes |
21J2Z
(Proposal)
|
|
Hydronic Heating Improvement
|
CORRECTIONS/
WAUPUN CORRECTIONAL INSTITUTION, WAUPUN
|
Andhole Engineering LLC
|
$223,600
|
Hoffmann
|
5/12/2023
| No |
22C3J GPC
|
|
Shared Operations Facility
GPC Bidding rescheduled to 5/25/2023.
|
NATURAL RESOURCES/
RICHARD BONG RECREATION AREA
|
Arc-Int Architecture
|
$1,190,400
|
Hall
|
4/20/2023
| No |
22D2A
(Proposal)
|
|
Laundry Water Piping Replacement
|
CORRECTIONS/
Wisconsin Secure Program Facility
|
Thunderbird Engineering, Inc.
|
$130,000
|
Windus
|
5/9/2023
| No |
18H3J GPC
|
|
Storm Water and Site Improvements
GPC Only
|
HEALTH SERVICES/
MENDOTA MENTAL HEALTH INSTITUTE, MADISON
|
GEI Consultants, Inc.
|
$1,400,000
|
Wischhoff
|
5/9/2023
| No |
20F2QREBID2 MEP
|
|
Elevator Modernization
|
UNIVERSITY OF WISCONSIN/
RIVER FALLS CAMPUS
|
Lien & Peterson Architects, Inc.
|
$423,000
|
Balciunas
|
5/9/2023
| No |
21D1V GPC
|
|
Boiler Replacement and DDC Installation
|
MILITARY AFFAIRS/
FORT ATKINSON
|
Middough Inc
|
$284,000
|
Dapp
|
4/18/2023
| No |
21K2V
(Proposal)
|
|
Radionuclide System Improvements
|
HEALTH SERVICES/
SOUTHERN WISCONSIN CENTER, UNION GROVE
|
Ruekert & Mielke, Inc.
|
$230,000
|
Kalscheur
|
5/8/2023
| No |
22G2X
(Proposal)
|
|
Remodel for Gender Inclusive Restroom
|
UNIVERSITY OF WISCONSIN/
GREEN BAY CAMPUS
|
Berners-Schober Associates, Inc.
|
$71,600
|
Hoffmann
|
| No |
22I1O
(Proposal)
|
|
Central Water Softener Replacement
|
HEALTH SERVICES/
WINNEBAGO MENTAL HEALTH INSTITUTE
|
Ring & DuChateau, LLP
|
$182,000
|
Windus
|
5/11/2023
| No |
21I3G
(Proposal)
|
|
Chapel Roof Replacement
|
CORRECTIONS/
GREEN BAY CORRECTIONAL INSTITUTION
|
Architects Group Limited
|
$60,000
|
Kirchstein
|
5/3/2023
| No |
21J1K
(Proposal)
|
|
Roof Replacement
Bid Date Rescheduled to May 23, 2023.
|
HEALTH SERVICES/
NORTHERN WISCONSIN CENTER, CHIPPEWA FALLS
|
Wendel Architectural Resources, Inc.
|
$228,100
|
Balciunas
|
4/24/2023
| No |
21K1T STC
|
|
North Building Duress System Replacement
Single Trade Contract - Electrical
|
HEALTH SERVICES/
WISCONSIN RESOURCE CENTER, WINNEBAGO
|
Spring Creek Engineering LLC
|
$640,000
|
Stehly
|
5/9/2023
| No |
21L1M GPC
|
|
Break Room Remodel
|
MILITARY AFFAIRS/
MADISON
|
Shive-Hattery
|
$490,000
|
Luttrell
|
4/25/2023
| No |
22B3L MEP
|
|
Shower Replacements
|
UNIVERSITY OF WISCONSIN/
STOUT CAMPUS
|
Cedar Corporation
|
$769,800
|
Wenzel
|
5/8/2023
| No |
22C5B
(Proposal)
|
|
Elevator Jack Replacement
|
UNIVERSITY OF WISCONSIN/
STEVENS POINT CAMPUS
|
KonText Architects, LLC
|
$219,000
|
Braun-Oddo
|
5/9/2023
| No |
19L2NREBID GPC
|
|
State Patrol Communication Tower Improvements
|
TRANSPORTATION/
STWD - Statewide
|
Edge Consulting Engineers, Inc.
|
$1,900,000
|
Ewing
|
| No |
20K1V GPC
|
|
Toilet Shower Building and Vault Toilet Replacement
|
NATURAL RESOURCES/
COUNCIL GROUNDS STATE PARK
|
MSA Professional Services, Inc.
|
$1,062,000
|
Wenzel
|
| No |
22L2F
(Proposal)
|
|
Heifer Research Barn Column Repair
|
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
|
DC Engineering, Inc.
|
$45,000
|
Luttrell
|
| No |
18H2JREBID MEP
|
|
New Secure Residential Treatment Unit and Diversion Unit
GPC Bidding rescheduled to 6/13/2023
|
CORRECTIONS/
OSHKOSH CORRECTIONAL INSTITUTION, OSHKOSH
|
Venture Architects
|
$1,884,000
|
Hoffmann
|
4/12/2023
| No |
19F3E-03 GPC
|
|
Albertson Hall Replacement
|
UNIVERSITY OF WISCONSIN/
STEVENS POINT CAMPUS
|
Workshop Architects, Inc.
|
$65,000,000
|
Braun-Oddo
|
4/13/2023
| No |
22C2A GPC
|
|
Perimeter Fence Repair and Replacement
GPC Only
|
CORRECTIONS/
NEW LISBON CORRECTIONAL INSTITUTION, NEW LISBON
|
Edge Consulting Engineers, Inc.
|
$1,720,700
|
Yahnke
|
4/27/2023
| No |
18K2S-03REBID GPC
|
|
Systems Repair
GPC Only
|
UNIVERSITY OF WISCONSIN/
WHITEWATER CAMPUS
|
Ring & DuChateau, LLP
|
$375,000
|
Otremba
|
| No |
21D4H GPC
|
|
Walter Way, Residence Life Lots and Softball Field Lot Repaving
|
UNIVERSITY OF WISCONSIN/
GREEN BAY CAMPUS
|
Ayres Associates, Inc.
|
$860,000
|
Wischhoff
|
| No |
21G1E STC
|
|
15kV Switchgear Replacement
STC - Electrical
|
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
|
Affiliated Engineers, Inc.
|
$4,000,000
|
McChesney
|
4/25/2023
| No |
21K3J GPC
|
|
Envelope Repairs
GPC Only
|
HEALTH SERVICES/
WISCONSIN RESOURCE CENTER, WINNEBAGO
|
KonText Architects, LLC
|
$1,526,000
|
Quilling
|
4/25/2023
| No |
22H1P
(Proposal)
|
|
Line of Sight Reconstruction
|
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
|
Kimley-Horn and Associates, Inc.
|
$75,000
|
Luttrell
|
| No |
21L3J RFP
(Proposal)
|
|
Engineering Building Replacement
See project notes section for RFP information
|
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
|
Continuum Architects + Planners
|
$250,000,000
|
von Below
|
| No |
22C3J MEP
|
|
Shared Operations Facility
MEP Bidding rescheduled to 5/11/2023.
|
NATURAL RESOURCES/
RICHARD BONG RECREATION AREA
|
Arc-Int Architecture
|
$1,190,400
|
Hall
|
4/20/2023
| No |
22C4F GPC
|
|
Expansion Joint Repair
GPC Only
|
CORRECTIONS/
JACKSON CORRECTIONAL INST., BLACK RIVER FALLS
|
Lien & Peterson Architects, Inc.
|
$393,300
|
Yahnke
|
5/2/2023
| No |
22F3W
(Proposal)
|
|
Shop Roof Replacement
|
NATURAL RESOURCES/
RICHARD BONG RECREATION AREA
|
Specialty Engineering Group LLC
|
$125,000
|
Hall
|
| No |
22J3B
(Proposal)
|
|
Sandburg North Radio Tower Demolition
|
UNIVERSITY OF WISCONSIN/
MILWAUKEE CAMPUS
|
Engberg Anderson, Inc.
|
$90,000
|
Hoffman
|
4/19/2023
| No |
21B1CREBID GPC
|
|
South Hall Elevator Upgrades
GPC Bidding rescheduled to 5/10/2023
|
CORRECTIONS/
PRAIRIE DU CHIEN CORRECTIONAL FACILITY
|
BWZ Architects
|
$650,000
|
Schaefer
|
3/23/2023
| No |
21D1V MEP
|
|
Boiler Replacement and DDC Installation
|
MILITARY AFFAIRS/
FORT ATKINSON
|
Middough Inc
|
$284,000
|
Dapp
|
4/18/2023
| No |
21K1E GPC
|
|
Digital Radio System and Interoperability Upgrade
|
HEALTH SERVICES/
WINNEBAGO MENTAL HEALTH INSTITUTE
|
Edge Consulting Engineers, Inc.
|
$840,000
|
Lux
|
4/11/2023
| No |
21K2U GPC
|
|
Lower Roof Replacement
GPC Only
|
HEALTH SERVICES/
WINNEBAGO MENTAL HEALTH INSTITUTE
|
InSite Consulting Architects, LLC
|
$1,100,000
|
Zamzow
|
4/25/2023
| No |
21L1M MEP
|
|
Break Room Remodel
|
MILITARY AFFAIRS/
MADISON
|
Shive-Hattery
|
$490,000
|
Luttrell
|
4/25/2023
| No |
22F1U
(Proposal)
|
|
Toilet Room Tile Repairs
|
UNIVERSITY OF WISCONSIN/
OSHKOSH CAMPUS
|
Berners-Schober Associates, Inc.
|
$101,700
|
Hoffmann
|
| No |
22G3C
(Proposal)
|
|
Door Replacements
|
CORRECTIONS/
MCNAUGHTON CORR. CENTER AND FARM, LAKE TOMAHAWK
|
Wendel Architectural Resources, Inc.
|
$85,200
|
Balciunas
|
4/19/2023
| No |
19L2NREBID MEP
|
|
State Patrol Communication Tower Improvements
|
TRANSPORTATION/
STWD - Statewide
|
Edge Consulting Engineers, Inc.
|
$1,900,000
|
Ewing
|
| No |
20K1V MEP
|
|
Toilet Shower Building and Vault Toilet Replacement
|
NATURAL RESOURCES/
COUNCIL GROUNDS STATE PARK
|
MSA Professional Services, Inc.
|
$1,062,000
|
Wenzel
|
| No |
22B4NREBID
(Proposal)
|
|
IV Room and Office Remodel
Less than 30 bidding days
|
CORRECTIONS/
DOC CENTRAL PHARMACY, WAUPUN
|
KonText Architects, LLC
|
$162,000
|
Becker
|
| No |
22E2T
(Proposal)
|
|
Auxiliary Power System Replacement
|
EDUCATION COMMUNICATIONS BOARD/
FOUNDATION - REGIONAL OFFICES
|
JDR Engineering, Inc.
|
$215,000
|
Lux
|
4/11/2023
| No |
19F3E-03 MEP
|
|
Albertson Hall Replacement
|
UNIVERSITY OF WISCONSIN/
STEVENS POINT CAMPUS
|
Workshop Architects, Inc.
|
$65,000,000
|
Braun-Oddo
|
4/13/2023
| No |
21C1Q GPC
|
|
North Campus Water Main Replacement
GPC Only
|
UNIVERSITY OF WISCONSIN/
GREEN BAY CAMPUS
|
Oneida Total Integrated Enterprises (OTIE)
|
$456,000
|
Wischhoff
|
4/14/2023
| No |
21D4H MEP
|
|
Walter Way, Residence Life Lots and Softball Field Lot Repaving
|
UNIVERSITY OF WISCONSIN/
GREEN BAY CAMPUS
|
Ayres Associates, Inc.
|
$860,000
|
Wischhoff
|
| No |
21H3I GPC
|
|
Police Department Renovation
Bidding has been cancelled.
|
STATE FAIR PARK/
STATE FAIR PARK - WEST ALLIS
|
Continuum Architects + Planners
|
$2,047,400
|
Janus
|
3/21/2023
| Yes |
21I2G GPC
|
|
Roadway Improvements
GPC Only
|
HEALTH SERVICES/
NORTHERN WISCONSIN CENTER, CHIPPEWA FALLS
|
Stevens Engineers, Inc.
|
$378,000
|
Wischhoff
|
| No |
21J3G GPC
|
|
Sidewalk Installation
|
MILITARY AFFAIRS/
CAMP WILLIAMS
|
Jewell Associates Engineers Inc
|
$330,500
|
Hall
|
3/27/2023
| No |
22A1K
(Proposal)
|
|
Boiler Repairs
|
CORRECTIONS/
JACKSON CORRECTIONAL INST., BLACK RIVER FALLS
|
HVP Design, Inc.
|
$115,000
|
Daniel
|
| No |
21I1U
(Proposal)
|
|
Main Server Room Cooling System Renovation
|
UNIVERSITY OF WISCONSIN/
STOUT CAMPUS
|
IMEG Corporation
|
$165,000
|
Stephan
|
4/6/2023
| No |
21K1E MEP
|
|
Digital Radio System and Interoperability Upgrade
|
HEALTH SERVICES/
WINNEBAGO MENTAL HEALTH INSTITUTE
|
Edge Consulting Engineers, Inc.
|
$840,000
|
Lux
|
4/11/2023
| No |
21L3S GPC
|
|
Roof Replacement
GPC Only
|
CORRECTIONS/
JACKSON CORRECTIONAL INST., BLACK RIVER FALLS
|
Cedar Corporation
|
$920,000
|
Kirchstein
|
4/4/2023
| No |
22B2V
(Proposal)
|
|
Cell Hall Railing Improvements
|
CORRECTIONS/
WAUPUN CORRECTIONAL INSTITUTION, WAUPUN
|
Architects Group Limited
|
$150,000
|
Zamzow
|
| No |
22C2V
(Proposal)
|
|
Fuel Pump and Tank Replacement
|
UNIVERSITY OF WISCONSIN/
PARKSIDE CAMPUS
|
GEI Consultants, Inc.
|
$79,600
|
Archimede
|
| No |
19F2Y-04 MEP
|
|
Camp Randall Stadium Heated Field
MEP Only Project
|
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
|
Berners-Schober Associates, Inc.
|
$5,000,000
|
Luttrell
|
3/30/2023
| Yes |
21E4D STC
|
|
Replace Boiler and Update DDC
STC - Mechanical
|
MILITARY AFFAIRS/
WHITEWATER
|
Andhole Engineering LLC
|
$374,000
|
Whitley
|
4/11/2023
| No |
21L2J-01 GPC
|
|
Pit C to Heating Plant Steam Line Replacement
PreBid Tour date rescheduled to 3/29/2023
|
CORRECTIONS/
OAKHILL CORRECTIONAL INSTITUTION, OREGON
|
Affiliated Engineers, Inc.
|
$1,100,000
|
Cunat
|
3/29/2023
| No |
22F3C
(Proposal)
|
|
Outside Classroom Repairs
|
UNIVERSITY OF WISCONSIN/
STOUT CAMPUS
|
Cedar Corporation
|
$90,000
|
Yahnke
|
| No |
22H1R
(Proposal)
|
|
Parking Ramp 36 Repairs
|
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
|
Shive-Hattery
|
$220,000
|
Luttrell
|
3/31/2023
| No |
21A3K GPC
|
|
Boiler Replacement and DDC Upgrade
|
MILITARY AFFAIRS/
FORT MCCOY
|
Salas O’Brien North, LLC
|
$2,090,000
|
Whitley
|
3/9/2023
| No |
21K1N
(Proposal)
|
|
Asphalt Replacement
|
CORRECTIONS/
KENOSHA CORRECTION CENTER, KENOSHA
|
K Singh & Associates Inc
|
$180,000
|
Shumaker
|
| No |
21H3I MEP
|
|
Police Department Renovation
Further bidding has been cancelled.
|
STATE FAIR PARK/
STATE FAIR PARK - WEST ALLIS
|
Continuum Architects + Planners
|
$2,047,400
|
Janus
|
3/21/2023
| Yes |
21K1J
(Proposal)
|
|
Envelope Analysis and Repair
|
UNIVERSITY OF WISCONSIN/
LA CROSSE CAMPUS
|
Specialty Engineering Group LLC
|
$176,000
|
Alderman
|
3/23/2023
| No |
21K1K
(Proposal)
|
|
Envelope Analysis and Repair
|
UNIVERSITY OF WISCONSIN/
LA CROSSE CAMPUS
|
Specialty Engineering Group LLC
|
$246,000
|
Alderman
|
3/23/2023
| No |
22H1Q
(Proposal)
|
|
Parking Ramp 76 Repairs
|
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
|
Shive-Hattery
|
$210,000
|
Luttrell
|
3/31/2023
| No |
21D1KREBID
(Proposal)
|
|
Fire Alarm Replacement
|
CORRECTIONS/
ROBERT ELLSWORTH CORRECTIONAL CENTER, UNION GROVE
|
Grumman/Butkus Associates, Ltd.
|
$230,400
|
Hartley
|
| No |
21J3G MEP
|
|
Sidewalk Installation
|
MILITARY AFFAIRS/
CAMP WILLIAMS
|
Jewell Associates Engineers Inc
|
$330,500
|
Hall
|
3/27/2023
| No |
22B4V GPC
|
|
Exterior Masonry Cleaning and Bird Netting Replacement
GPC Only
|
ADMINISTRATION/
ADMINISTRATIVE FACILITIES
|
Specialty Engineering Group LLC
|
$850,000
|
List
|
3/30/2023
| No |
22C4W GPC
|
|
Roof Replacement
GPC Only
|
HEALTH SERVICES/
SECURE TREATMENT FACILITY, MAUSTON
|
Cedar Corporation
|
$1,123,200
|
Yahnke
|
3/22/2023
| No |
22G1J
(Proposal)
|
|
Steam and Condensate Repairs
|
CORRECTIONS/
WAUPUN CORRECTIONAL INSTITUTION, WAUPUN
|
Ring & DuChateau, LLP
|
$200,000
|
Otremba
|
| No |
22J1C
(Proposal)
|
|
Sanitary Lateral Replacement
|
UNIVERSITY OF WISCONSIN/
WHITEWATER CAMPUS
|
Short Elliott Hendrickson Inc
|
$117,300
|
Hall
|
| No |
21B1CREBID MEP
|
|
South Hall Elevator Upgrades
GPC Bidding rescheduled to 5/10/2023
|
CORRECTIONS/
PRAIRIE DU CHIEN CORRECTIONAL FACILITY
|
BWZ Architects
|
$650,000
|
Schaefer
|
3/23/2023
| No |
22B3GREBID STC
|
|
Heating Pipe System Replacement
STC Mechanical
|
CORRECTIONS/
STANLEY CORRECTIONAL INSTITUTION, STANLEY
|
Ayres Associates, Inc.
|
$3,500,000
|
Otremba
|
| No |
22I1F-01
(Proposal)
|
|
Northwest EV Charging Station Installations
|
NATURAL RESOURCES/
ADMINISTRATIVE FACILITIES
|
Timper Associates Engineers LLC
|
$76,000
|
Whitley
|
| No |
22I1F-02
(Proposal)
|
|
Northeast EV Charging Station Installations
|
NATURAL RESOURCES/
NORTHEAST REGION HDQRS
|
Timper Associates Engineers LLC
|
$56,500
|
Whitley
|
| No |
22I1F-03
(Proposal)
|
|
Southcentral EV Charging Station Installations
|
NATURAL RESOURCES/
NEVIN HATCHERY
|
Timper Associates Engineers LLC
|
$22,500
|
Whitley
|
| No |
19F1Y GPC
|
|
HVAC System Renovation
Bidding Cancelled, project to be rebid
|
UNIVERSITY OF WISCONSIN/
EAU CLAIRE CAMPUS
|
HVP Design, Inc.
|
$1,136,500
|
Stephan
|
3/16/2023
| No |
20B2I GPC
|
|
Technology Wing Laboratory Renovation
GPC Bidding rescheduled to 4/11/2023.
|
UNIVERSITY OF WISCONSIN/
STOUT CAMPUS
|
IMEG Corporation
|
$6,393,000
|
Stephan
|
2/16/2023
| No |
21H1C GPC
|
|
Mercer Ranger Station Replacement
|
NATURAL RESOURCES/
MERCER STATION
|
Cedar Corporation
|
$3,281,000
|
Balciunas
|
3/15/2023
| No |
22B1S
(Proposal)
|
|
Renovate Boat Landing 6 Phase 2
|
NATURAL RESOURCES/
PESHTIGO RIVER STATE FOREST
|
U. P. Engineers & Architects
|
$180,000
|
Schaefer
|
| No |
22B1T
(Proposal)
|
|
Repair Boat Landing 11
|
NATURAL RESOURCES/
PESHTIGO RIVER STATE FOREST
|
U. P. Engineers & Architects
|
$90,000
|
Schaefer
|
| No |
22H3D
(Proposal)
|
|
Security Glass Replacement
|
CORRECTIONS/
COLUMBIA CORRECTIONAL INSTITUTION, PORTAGE
|
Specialty Engineering Group LLC
|
$221,000
|
Quilling
|
3/28/2023
| No |
20J1N GPC
|
|
Utility Corridor Renovation
GPC Bidding rescheduled to 4/6/2023.
|
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
|
Oneida Total Integrated Enterprises (OTIE)
|
$3,600,000
|
Anderson
|
2/15/2023
| No |
21H3BREBID
(Proposal)
|
|
Boiler Replacement
|
MILITARY AFFAIRS/
MERRILL
|
HVP Design, Inc.
|
$197,000
|
Daniel
|
3/16/2023
| No |
21J1Z
(Proposal)
|
|
HVAC Controls Replacement
|
CORRECTIONS/
BURKE CORRECTION CENTER, WAUPUN
|
Grumman/Butkus Associates, Ltd.
|
$165,000
|
DeValk
|
3/14/2023
| No |
21L2J-01 MEP
|
|
Pit C to Heating Plant Steam Line Replacement
PreBid Tour date rescheduled to 3/29/2023
|
CORRECTIONS/
OAKHILL CORRECTIONAL INSTITUTION, OREGON
|
Affiliated Engineers, Inc.
|
$1,100,000
|
Cunat
|
3/29/2023
| No |
20E1W
(Proposal)
|
|
Rowe House HVAC Replacement
|
HISTORICAL SOCIETY/
PENDARVIS - CORNISH MINERS HOMES
|
JDR Engineering, Inc.
|
$143,000
|
Pearce
|
3/14/2023
| No |
21A3K MEP
|
|
Boiler Replacement and DDC Upgrade
|
MILITARY AFFAIRS/
FORT MCCOY
|
Salas O’Brien North, LLC
|
$2,090,000
|
Whitley
|
3/9/2023
| No |
21J1AREBID
(Proposal)
|
|
Campus Sidewalk and Path Replacement
|
UNIVERSITY OF WISCONSIN/
GREEN BAY CAMPUS
|
Oneida Engineering Solutions, LLC
|
$234,000
|
Wischhoff
|
| No |
22A2I
(Proposal)
|
|
Concrete Stair Repairs
|
HEALTH SERVICES/
MENDOTA MENTAL HEALTH INSTITUTE, MADISON
|
Jewell Associates Engineers Inc
|
$240,000
|
Wischhoff
|
3/28/2023
| No |
22C1K GPC
|
|
Roof Replacement
GPC Only
|
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
|
Building Envelope Professionals Group LLC
|
$406,900
|
Quilling
|
3/13/2023
| No |
19G1Y GPC
|
|
Plaza Waterproofing Repairs
|
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
|
Pierce Engineers, Inc.
|
$4,800,000
|
Luttrell
|
3/8/2023
| No |
22B3S
(Proposal)
|
|
Re-Gravel Main Access Road
|
NATURAL RESOURCES/
FLAMBEAU RIVER STATE FOREST
|
DNR - Dept. of Natural Resources
|
$125,000
|
Kalscheur
|
| No |
22F4G
(Proposal)
|
|
Rooftop Condensing Unit Replacement
|
CORRECTIONS/
STURTEVANT CORRECTIONAL CENTER, STURTEVANT
|
Henneman Engineering, Inc.
|
$130,000
|
Pearce
|
3/16/2023
| No |
19I1M AAC
|
|
Science and Technology Innovation Center
|
UNIVERSITY OF WISCONSIN/
RIVER FALLS CAMPUS
|
BWBR Architects, Inc.
|
$86,690,200
|
Quilling
|
2/28/2023
| No |
19I1M GPC
|
|
Science and Technology Innovation Center
|
UNIVERSITY OF WISCONSIN/
RIVER FALLS CAMPUS
|
BWBR Architects, Inc.
|
$86,690,200
|
Quilling
|
2/28/2023
| No |
21A3L GPC
|
|
Parking Ramp Repairs
|
UNIVERSITY OF WISCONSIN/
MILWAUKEE CAMPUS
|
GRAEF
|
$2,699,000
|
Becker
|
3/9/2023
| No |
22D1UREBID2
(Proposal)
|
|
Elevator Upgrades and Repairs
Less than 30 bidding days.
|
UNIVERSITY OF WISCONSIN/
MILWAUKEE CAMPUS
|
Performance Elevator Consulting LLC
|
$205,000
|
Hoffman
|
| No |
22G1Y
(Proposal)
|
|
Courtyard Pavement Replacements
|
CORRECTIONS/
RACINE CORRECTIONAL INSTITUTION, STURTEVANT
|
Professional Engineering LLC
|
$215,000
|
Kolaszewski
|
3/14/2023
| No |
22B2S GPC
|
|
Asphalt Replacement
GPC Only
|
CORRECTIONS/
LINCOLN HILLS SCHOOL, MERRILL
|
Clark Dietz, Inc.
|
$2,330,000
|
Kolaszewski
|
3/8/2023
| No |
23A1H
(Proposal)
|
|
Statewide Pavement Maintenance 2023-2024
|
BUILDING COMMISSION/
Miscellaneous
|
Division of Facilities Development (DFD)
|
$5,000
|
Shumaker
|
| No |
19F1Y MEP
|
|
HVAC System Renovation
GPC Bidding Cancelled, project to be rebid.
|
UNIVERSITY OF WISCONSIN/
EAU CLAIRE CAMPUS
|
HVP Design, Inc.
|
$1,136,500
|
Stephan
|
3/16/2023
| No |
20B2IREBID MEP
|
|
Technology Wing Laboratory Renovation
Plumbing Rebid 3/28/2023. GPC moved to 4/11/2023.
|
UNIVERSITY OF WISCONSIN/
STOUT CAMPUS
|
IMEG Corporation
|
$6,393,000
|
Stephan
|
| No |
21F2W
(Proposal)
|
|
Shoreline Revetment
|
NATURAL RESOURCES/
POTAWATOMI STATE PARK
|
Ayres Associates, Inc.
|
$136,000
|
Wischhoff
|
| No |
21H1C MEP
|
|
Mercer Ranger Station Replacement
|
NATURAL RESOURCES/
MERCER STATION
|
Cedar Corporation
|
$3,281,000
|
Balciunas
|
3/15/2023
| No |
22B4N
(Proposal)
|
|
IV Room and Office Remodel
|
CORRECTIONS/
DOC CENTRAL PHARMACY, WAUPUN
|
KonText Architects, LLC
|
$162,000
|
Becker
|
3/9/2023
| No |
20J1NREBID
|
|
Utility Corridor Renovation
Mechanical (HVAC) Rebid 3/23, GPC moved to 4/6
|
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
|
Oneida Total Integrated Enterprises (OTIE)
|
$3,600,000
|
Anderson
|
| No |
19K2K GPC
|
|
Water System Improvements
|
CORRECTIONS/
CENTRAL GENERATING PLANT, WAUPUN
|
MSA Professional Services, Inc.
|
$6,000,000
|
Kalscheur
|
2/7/2023
| No |
21J2O
(Proposal)
|
|
Asphalt Replacement
|
CORRECTIONS/
FOX LAKE CORRECTIONAL INSTITUTION, FOX LAKE
|
Stantec Consulting Services, Inc.
|
$220,000
|
Shumaker
|
3/7/2023
| No |
22E2P
(Proposal)
|
|
Replace Property Fuel Storage Tanks
Less than 30 bidding days
|
NATURAL RESOURCES/
MEAD WILDLIFE AREA
|
GEI Consultants, Inc.
|
$150,000
|
Cunat
|
| No |
19G1Y MEP
|
|
Plaza Waterproofing Repairs
|
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
|
Pierce Engineers, Inc.
|
$4,800,000
|
Luttrell
|
3/8/2023
| No |
22D3O
(Proposal)
|
|
Roof 1 Replacement
|
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
|
Christopher Kidd & Associates A/E
|
$96,000
|
Luttrell
|
3/7/2023
| No |
19I1M MEP
|
|
Science and Technology Innovation Center
|
UNIVERSITY OF WISCONSIN/
RIVER FALLS CAMPUS
|
BWBR Architects, Inc.
|
$86,690,200
|
Quilling
|
2/28/2023
| No |
21A3L MEP
|
|
Parking Ramp Repairs
|
UNIVERSITY OF WISCONSIN/
MILWAUKEE CAMPUS
|
GRAEF
|
$2,699,000
|
Becker
|
3/9/2023
| No |
21C3W
(Proposal)
|
|
Campground Water Infrastructure Improvements
|
NATURAL RESOURCES/
YELLOWSTONE LAKE STATE PARK
|
Foth Infrastructure & Environment LLC
|
$200,000
|
Shumaker
|
2/28/2023
| No |
22F3V
(Proposal)
|
|
Barn Roof Replacement
|
NATURAL RESOURCES/
WILDCAT MOUNTAIN STATE PARK
|
Specialty Engineering Group LLC
|
$75,000
|
Yahnke
|
| No |
23A1W AAC
|
|
2023-2025 Statewide Asbestos Abatement Services
AAC Only
|
BUILDING COMMISSION/
Miscellaneous
|
Division of Facilities Development (DFD)
|
$150,000
|
Jungen
|
| No |
21C1P GPC
|
|
A Tower Ventilation Renovation
|
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
|
Grumman/Butkus Associates, Ltd.
|
$2,400,000
|
Schorr
|
2/14/2023
| No |
21E3P
(Proposal)
|
|
B540 Lab Exterior Door Upgrade
|
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
|
Berners-Schober Associates, Inc.
|
$85,000
|
Luttrell
|
2/28/2023
| No |
21F3W
(Proposal)
|
|
Electrical and IT Infrastructure Improvements
|
HISTORICAL SOCIETY/
HISTORICAL SOCIETY, MADISON
|
JDR Engineering, Inc.
|
$220,000
|
Lux
|
2/28/2023
| No |
22B1M GPC
|
|
East Steam Repairs
|
HEALTH SERVICES/
SOUTHERN WISCONSIN CENTER, UNION GROVE
|
Oneida Total Integrated Enterprises (OTIE)
|
$1,200,000
|
Otremba
|
2/8/2023
| No |
22C3A
(Proposal)
|
|
Inner Security Road Reconstruction
|
HEALTH SERVICES/
MENDOTA MENTAL HEALTH INSTITUTE, MADISON
|
Jewell Associates Engineers Inc
|
$140,700
|
Hall
|
2/28/2023
| No |
15K1F-01 GPC
|
|
South Campus Utility Improvements, Phase II
|
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
|
Affiliated Engineers, Inc.
|
$3,900,000
|
Anderson
|
2/9/2023
| No |
20J1J GPC
|
|
Fire Suppression System Renovation
|
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
|
McGowan Architecture LLC
|
$2,025,000
|
Windus
|
2/14/2023
| No |
20K2F GPC
|
|
Road and Parking Lot Improvements
GPC Only
|
NATURAL RESOURCES/
TERRY ANDRAE STATE PARK
|
Ayres Associates, Inc.
|
$500,000
|
Shumaker
|
| No |
22B1U
(Proposal)
|
|
Greenhouse Repairs
|
UNIVERSITY OF WISCONSIN/
WHITEWATER CAMPUS
|
Isthmus Architecture, Inc.
|
$127,100
|
Hall
|
2/23/2023
| No |
22D1UREBID
(Proposal)
|
|
Elevator Upgrades and Repairs
|
UNIVERSITY OF WISCONSIN/
MILWAUKEE CAMPUS
|
Performance Elevator Consulting LLC
|
$205,000
|
Hoffman
|
| No |
22G1T
(Proposal)
|
|
Barrack Window Replacement
|
CORRECTIONS/
JACKSON CORRECTIONAL INST., BLACK RIVER FALLS
|
Cedar Corporation
|
$92,600
|
Zamzow
|
2/22/2023
| No |
19K2K MEP
|
|
Water System Improvements
|
CORRECTIONS/
CENTRAL GENERATING PLANT, WAUPUN
|
MSA Professional Services, Inc.
|
$6,000,000
|
Kalscheur
|
2/7/2023
| No |
21J1V GPC
|
|
Food Service Tunnel Repairs
|
HEALTH SERVICES/
WINNEBAGO MENTAL HEALTH INSTITUTE
|
Oneida Total Integrated Enterprises (OTIE)
|
$1,200,000
|
Otremba
|
2/2/2023
| No |
21L1T GPC
|
|
Steam Line Replacement
PreBid Tour Date Rescheduled to 2/6/2023 at 9:00AM
|
CORRECTIONS/
TAYCHEEDAH CORRECTIONAL INSTITUTION
|
K Singh & Associates Inc
|
$3,000,000
|
Otremba
|
2/6/2023
| No |
22A2F GPC
|
|
Exterior Stair Replacement
GPC Only
|
UNIVERSITY OF WISCONSIN/
PARKSIDE CAMPUS
|
Dimension IV Madison Design Group
|
$1,694,313
|
Hall
|
2/14/2023
| No |
19L1IREBID GPC
|
|
VoIP and Member Safety Upgrades
Bidding rescheduled to 3/7/2023.
|
VETERANS AFFAIRS/
WISCONSIN VETERANS HOME-UNION GROVE
|
Henneman Engineering, Inc.
|
$840,000
|
Lux
|
1/4/2023
| No |
20B2I MEP
|
|
Technology Wing Laboratory Renovation
Plumbing Rebid 3/28/2023. GPC moved to 4/11/2023.
|
UNIVERSITY OF WISCONSIN/
STOUT CAMPUS
|
IMEG Corporation
|
$6,393,000
|
Stephan
|
2/16/2023
| No |
21C2HREBID GPC
|
|
Roof Replacement
GPC Only
|
MILITARY AFFAIRS/
GREEN BAY
|
Building Envelope Professionals Group LLC
|
$985,000
|
Kirchstein
|
2/16/2023
| No |
19F2R GPC
|
|
Multi-Building Elevator Renovations
GPC Bidding rescheduled to 3/2/2023.
|
UNIVERSITY OF WISCONSIN/
STEVENS POINT CAMPUS
|
Architects Group Limited
|
$1,484,000
|
Braun-Oddo
|
1/5/2023
| No |
21C3Z GPC
|
|
Repair and Replace Concrete Pavement
GPC Only
|
MILITARY AFFAIRS/
FORT MCCOY
|
Kapur & Associates, Inc.
|
$731,400
|
Yahnke
|
2/15/2023
| No |
21L1R STC
|
|
Deaerator Replacement
Single Trade Contract - Mechanical
|
CORRECTIONS/
OAKHILL CORRECTIONAL INSTITUTION, OREGON
|
Juhl Energy, Inc. dba Power Engineers Collaborative LLC
|
$500,000
|
Jansen
|
2/13/2023
| No |