List of Projects Out for Bid
Friday, Jun 2 2023
Project Number | Plans Available On | Bid Date | Project Title/Bid Documents | Agency/Institution/Building | A/E | Estimate Construction Cost | Project Manager | Prebid Tour Date | Prebid Tour Mandatory |
20B3L GPC
|
5/24/2023
Plan Holders
|
7/27/2023
|
North Building Units 9 and 10 Wet Cell Remodel
|
HEALTH SERVICES/
WISCONSIN RESOURCE CENTER, WINNEBAGO
/WIS RES CTR-NORTH
|
Venture Architects
|
$4,500,000
|
Schaefer
|
6/27/2023
| No |
21C4F GPC
|
5/18/2023
Plan Holders
|
7/20/2023
|
Remodel Latrine and Replace Shop Ventilation
|
MILITARY AFFAIRS/
MADISON
/ARMORY-AVIATION-TRUAX
|
KonText Architects, LLC
|
$1,308,000
|
Janus
|
6/13/2023
| No |
22E1Q GPC
|
5/23/2023
Plan Holders
|
7/20/2023
|
Cooler Replacement
Addenda to Date: 1
|
UNIVERSITY OF WISCONSIN/
EAU CLAIRE CAMPUS
/HILLTOP CENTER
|
Lien & Peterson Architects, Inc.
|
$643,200
|
Kolaszewski
|
6/21/2023
| No |
18J2E GPC
|
5/24/2023
Plan Holders
|
7/19/2023
|
North Point Improvements
|
STATE FAIR PARK/
STATE FAIR PARK - WEST ALLIS
|
Vierbicher Associates, Inc.
|
$3,800,000
|
Schaefer
|
6/15/2023
| No |
22B3O GPC
|
5/18/2023
Plan Holders
|
7/19/2023
|
Boiler Replacement
|
CORRECTIONS/
OSHKOSH CORRECTIONAL INSTITUTION, OSHKOSH
|
Andhole Engineering LLC
|
$1,111,000
|
Daniel
|
6/14/2023
| No |
20B3L MEP
|
5/24/2023
Plan Holders
|
7/13/2023
|
North Building Units 9 and 10 Wet Cell Remodel
|
HEALTH SERVICES/
WISCONSIN RESOURCE CENTER, WINNEBAGO
/WIS RES CTR-NORTH
|
Venture Architects
|
$4,500,000
|
Schaefer
|
6/27/2023
| No |
22A3D GPC
|
5/23/2023
Plan Holders
|
7/13/2023
|
Lift Station 1 and 2 Rehabilitation
|
MILITARY AFFAIRS/
CAMP WILLIAMS
/MULTI-BUILDING
|
MSA Professional Services, Inc.
|
$248,000
|
Kolaszewski
|
| No |
22E2W GPC
|
5/23/2023
Plan Holders
|
7/13/2023
|
Window Treatment Replacement
GPC Only
|
ADMINISTRATION/
ADMINISTRATIVE FACILITIES
/WISCONSIN STATE CAPITOL
|
KonText Architects, LLC
|
$1,505,900
|
List
|
6/22/2023
| No |
19D2A-01 GPC
|
5/23/2023
Plan Holders
|
7/12/2023
|
Alternate Water Supply Pump Replacement
|
HEALTH SERVICES/
WINNEBAGO MENTAL HEALTH INSTITUTE
/RESERVOIR
|
Ruekert & Mielke, Inc.
|
$375,000
|
Kalscheur
|
6/14/2023
| No |
21H3IREBID GPC
|
5/23/2023
Plan Holders
|
7/12/2023
|
Police Department Renovation
|
STATE FAIR PARK/
STATE FAIR PARK - WEST ALLIS
|
Continuum Architects + Planners
|
$2,047,400
|
Janus
|
6/7/2023
| No |
22I2D
(Proposal)
|
5/24/2023
Plan Holders
|
7/11/2023
|
Barn Envelope Repairs
|
CORRECTIONS/
CHIPPEWA VALLEY CORRECTIONAL TREATMENT FACILITY
/FURNITURE SHOP-GARAGE
|
Lien & Peterson Architects, Inc.
|
$150,000
|
Balciunas
|
6/20/2023
| No |
21C4F MEP
|
5/18/2023
Plan Holders
|
7/6/2023
|
Remodel Latrine and Replace Shop Ventilation
|
MILITARY AFFAIRS/
MADISON
/ARMORY-AVIATION-TRUAX
|
KonText Architects, LLC
|
$1,308,000
|
Janus
|
6/13/2023
| No |
22E1Q MEP
|
5/23/2023
Plan Holders
|
7/6/2023
|
Cooler Replacement
Addenda to Date: 1
|
UNIVERSITY OF WISCONSIN/
EAU CLAIRE CAMPUS
/HILLTOP CENTER
|
Lien & Peterson Architects, Inc.
|
$643,200
|
Kolaszewski
|
6/21/2023
| No |
22F4A
(Proposal)
|
5/18/2023
Plan Holders
|
7/6/2023
|
Parking Area Redevelopment
|
NATURAL RESOURCES/
SILVER LAKE
|
DNR - Dept. of Natural Resources
|
$107,800
|
Kolaszewski
|
| No |
23C2Q
(Proposal)
|
5/23/2023
Plan Holders
|
7/6/2023
|
Boiler Bottom Blowdown Valve Replacement
|
CORRECTIONS/
GREEN BAY CORRECTIONAL INSTITUTION
/HEATING PLT & CHIMNEY
|
Ring & DuChateau, LLP
|
$109,000
|
Daniel
|
| No |
18J2E MEP
|
5/24/2023
Plan Holders
|
7/5/2023
|
North Point Improvements
|
STATE FAIR PARK/
STATE FAIR PARK - WEST ALLIS
|
Vierbicher Associates, Inc.
|
$3,800,000
|
Schaefer
|
6/15/2023
| No |
22B3O MEP
|
5/18/2023
Plan Holders
|
7/5/2023
|
Boiler Replacement
|
CORRECTIONS/
OSHKOSH CORRECTIONAL INSTITUTION, OSHKOSH
|
Andhole Engineering LLC
|
$1,111,000
|
Daniel
|
6/14/2023
| No |
22H2F
(Proposal)
|
5/18/2023
Plan Holders
|
6/29/2023
|
Shower Mixer Valves Replacement
|
STATE FAIR PARK/
STATE FAIR PARK - WEST ALLIS
/YOUTH DORMITORY
|
Oneida Total Integrated Enterprises (OTIE)
|
$190,000
|
Windus
|
6/13/2023
| No |
22H3R
(Proposal)
|
5/23/2023
Plan Holders
|
6/29/2023
|
Rock Lake Bridge Repairs
|
NATURAL RESOURCES/
GLACIAL DRUMLIN STATE TRAIL
|
Collins Engineers, Inc.
|
$260,000
|
Kolaszewski
|
| No |
22K1X
(Proposal)
|
5/18/2023
Plan Holders
|
6/29/2023
|
WEM Room 224 Remodel
|
MILITARY AFFAIRS/
MADISON
/STARC ARMORY & ADJ-GEN OFF
|
KonText Architects, LLC
|
$155,000
|
Luttrell
|
6/13/2023
| No |
20D1B AAC
|
5/3/2023
Plan Holders
|
6/28/2023
|
HVAC System Renovation
|
UNIVERSITY OF WISCONSIN/
LA CROSSE CAMPUS
/MAIN HALL - GRAFF
|
Design Engineers
|
$12,000,000
|
Stephan
|
5/25/2023
| No |
20D1B GPC
|
5/3/2023
Plan Holders
|
6/28/2023
|
HVAC System Renovation
|
UNIVERSITY OF WISCONSIN/
LA CROSSE CAMPUS
/MAIN HALL - GRAFF
|
Design Engineers
|
$12,000,000
|
Stephan
|
5/25/2023
| No |
21J1P STC
|
5/17/2023
Plan Holders
|
6/28/2023
|
Electrical System Improvements
Single Trade Contract - Electrical
|
HEALTH SERVICES/
CENTRAL WISCONSIN CENTER, MADISON
/MULTI - BUILDING
|
Leedy & Petzold Associates LLC
|
$2,000,000
|
McChesney
|
6/14/2023
| No |
22A3D MEP
|
5/23/2023
Plan Holders
|
6/28/2023
|
Lift Station 1 and 2 Rehabilitation
|
MILITARY AFFAIRS/
CAMP WILLIAMS
/MULTI-BUILDING
|
MSA Professional Services, Inc.
|
$248,000
|
Kolaszewski
|
| No |
22D2G
(Proposal)
|
5/23/2023
Plan Holders
|
6/28/2023
|
Loading Dock Concrete Replacement
|
CORRECTIONS/
OSHKOSH CORRECTIONAL INSTITUTION, OSHKOSH
/MULTI - BUILDING
|
MxGrp, Inc.
|
$180,000
|
Hoffmann
|
6/7/2023
| No |
19D2A-01 MEP
|
5/23/2023
Plan Holders
|
6/27/2023
|
Alternate Water Supply Pump Replacement
|
HEALTH SERVICES/
WINNEBAGO MENTAL HEALTH INSTITUTE
/RESERVOIR
|
Ruekert & Mielke, Inc.
|
$375,000
|
Kalscheur
|
6/14/2023
| No |
21H3IREBID MEP
|
5/23/2023
Plan Holders
|
6/27/2023
|
Police Department Renovation
|
STATE FAIR PARK/
STATE FAIR PARK - WEST ALLIS
|
Continuum Architects + Planners
|
$2,047,400
|
Janus
|
6/7/2023
| No |
22J3G
(Proposal)
|
5/18/2023
Plan Holders
|
6/27/2023
|
Envelope Repairs
|
UNIVERSITY OF WISCONSIN/
STOUT CAMPUS
/MULTI - BUILDING
|
Cedar Corporation
|
$156,400
|
Quilling
|
6/8/2023
| No |
22D5A RFP
|
5/26/2023
Plan Holders
|
6/26/2023
|
Camp Randall Sports Center Replacement
See project notes section for RFP information
|
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
|
N/A
|
$220,000,000
|
Luttrell
|
| No |
21L2K GPC
|
5/15/2023
Plan Holders
|
6/22/2023
|
Roof Replacement
GPC Only
|
TRANSPORTATION/
DTD - DISTRICT 1
|
Specialty Engineering Group LLC
|
$425,000
|
Hall
|
| No |
21L2W GPC
|
5/18/2023
Plan Holders
|
6/22/2023
|
Campground Water Infrastructure Improvements
GPC Only
|
NATURAL RESOURCES/
WYALUSING STATE PARK
|
Foth Infrastructure & Environment LLC
|
$274,000
|
Shumaker
|
| No |
21L3I GPC
|
4/26/2023
Plan Holders
|
6/22/2023
|
Cliffwood Toilet Shower Building Replacement
|
NATURAL RESOURCES/
MIRROR LAKE STATE PARK
/TOILET - TOILET/SHOWER
|
Jewell Associates Engineers Inc
|
$1,040,000
|
Schaefer
|
5/23/2023
| No |
22E2TREBID
(Proposal)
|
5/17/2023
Plan Holders
|
6/22/2023
|
Auxiliary Power System Replacement
|
EDUCATION COMMUNICATIONS BOARD/
FOUNDATION - REGIONAL OFFICES
/REGIONAL OFFICE-EQUIPMENT
|
JDR Engineering, Inc.
|
$215,000
|
Lux
|
6/6/2023
| No |
23A1B
(Proposal)
|
5/15/2023
Plan Holders
|
6/22/2023
|
Joint Repairs and Membrane Replacement
|
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
/CLINICAL SCI PARKING RAMP
|
Pierce Engineers, Inc.
|
$231,000
|
Luttrell
|
6/6/2023
| No |
19F4I
(Proposal)
|
5/4/2023
Plan Holders
|
6/21/2023
|
Replace North Campground Lift Station
|
NATURAL RESOURCES/
INTERSTATE PARK
|
DNR - Dept. of Natural Resources
|
$190,000
|
Kalscheur
|
6/5/2023
| No |
20I1HREBID GPC
|
4/18/2023
Plan Holders
|
6/21/2023
|
Fire Suppression System Renovation
|
UNIVERSITY OF WISCONSIN/
UW EXTENSION
/GEOL & NAT HISTORY STORAGE
|
Thunderbird Engineering, Inc.
|
$520,000
|
Coddington
|
5/17/2023
| No |
21D4G
(Proposal)
|
5/17/2023
Plan Holders
|
6/21/2023
|
Kitchen Quarry Tile Replacement
|
CORRECTIONS/
RACINE CORRECTIONAL INSTITUTION, STURTEVANT
/RCI FOOD PRODUCTION FACILITY
|
Partners in Design Architects Inc
|
$230,000
|
Wischhoff
|
5/30/2023
| No |
22A2K AAC
|
4/28/2023
Plan Holders
|
6/21/2023
|
Boiler 6 Installation
|
HEALTH SERVICES/
MENDOTA MENTAL HEALTH INSTITUTE, MADISON
/HEAT PLNT BOILER ADDN
|
Ring & DuChateau, LLP
|
$3,500,000
|
Jansen
|
5/15/2023
| No |
22A2K GPC
|
4/28/2023
Plan Holders
|
6/21/2023
|
Boiler 6 Installation
|
HEALTH SERVICES/
MENDOTA MENTAL HEALTH INSTITUTE, MADISON
/HEAT PLNT BOILER ADDN
|
Ring & DuChateau, LLP
|
$3,500,000
|
Jansen
|
5/15/2023
| No |
22A1A GPC
Revised
5/1/2023
|
3/20/2023
Plan Holders
|
6/20/2023
|
Window Replacement
GPC Only - GPC Bidding Moved to 6/20/23
Addenda to Date: 1
|
CORRECTIONS/
BLACK RIVER CORRECTION CENTER, KOMENSKY
/MAIN BLDG
|
Ayres Associates, Inc.
|
$670,000
|
Kolaszewski
|
4/13/2023
| No |
22E2I GPC
|
5/15/2023
Plan Holders
|
6/20/2023
|
Reconstruct Campground Roads and Water Mains
GPC Only
|
NATURAL RESOURCES/
POINT BEACH STATE FOREST
/CONTACT STATION
|
JT Engineering, Inc.
|
$1,590,000
|
Kolaszewski
|
6/2/2023
| No |
22F3WREBID
(Proposal)
|
5/24/2023
Plan Holders
|
6/20/2023
|
Shop Roof Replacement
Less than 30 bidding days
|
NATURAL RESOURCES/
RICHARD BONG RECREATION AREA
/SHOP - VEHICLE & EQUIPMENT MAINTENANCE
|
Specialty Engineering Group LLC
|
$125,000
|
Hall
|
| No |
22G1Z
(Proposal)
|
5/15/2023
Plan Holders
|
6/20/2023
|
Cooling Tower Pipe Replacement
|
CORRECTIONS/
WAUPUN CORRECTIONAL INSTITUTION, WAUPUN
/ADMINISTRATION
|
Design Engineers
|
$172,000
|
Stephan
|
| No |
22K1H
(Proposal)
|
5/4/2023
Plan Holders
|
6/20/2023
|
Entrance Sidewalk Replacement
|
CORRECTIONS/
NEW LISBON CORRECTIONAL INSTITUTION, NEW LISBON
/GATEHOUSE/ADMINISTRATION
|
Kapur & Associates, Inc.
|
$162,000
|
Yahnke
|
5/31/2023
| No |
22A1O STC
|
5/4/2023
Plan Holders
|
6/15/2023
|
Electrical Distribution Upgrades
Single Trade Contract - Electrical
|
ADMINISTRATION/
ADMINISTRATIVE FACILITIES
|
I & S Group, Inc.
|
$321,600
|
List
|
6/1/2023
| No |
23A1G
(Proposal)
|
5/4/2023
Plan Holders
|
6/15/2023
|
Boiler Tube Replacement
Addenda to Date: 1
|
CORRECTIONS/
REDGRANITE CORRECTIONAL INSTITUTION, REDGRANITE
/POWER PLANT
|
Ring & DuChateau, LLP
|
$184,000
|
Daniel
|
| No |
23B1V
(Proposal)
|
5/15/2023
Plan Holders
|
6/15/2023
|
Masonry Repairs Phase 3
|
ADMINISTRATION/
ADMINISTRATIVE FACILITIES
/WISCONSIN STATE CAPITOL
|
KonText Architects, LLC
|
$218,900
|
List
|
5/31/2023
| No |
20D1B MEP
|
5/3/2023
Plan Holders
|
6/14/2023
|
HVAC System Renovation
|
UNIVERSITY OF WISCONSIN/
LA CROSSE CAMPUS
/MAIN HALL - GRAFF
|
Design Engineers
|
$12,000,000
|
Stephan
|
5/25/2023
| No |
21E2U GPC
|
4/28/2023
Plan Holders
|
6/14/2023
|
Multi-Building Historic Homes Renovations
GPC Only
|
UNIVERSITY OF WISCONSIN/
OSHKOSH CAMPUS
/MULTI - BUILDING
|
InSite Consulting Architects, LLC
|
$2,500,000
|
Schaefer
|
5/25/2023
| No |
22B4VREBID GPC
|
5/12/2023
Plan Holders
|
6/14/2023
|
Exterior Masonry Cleaning and Bird Netting Replacement
GPC Only
|
ADMINISTRATION/
ADMINISTRATIVE FACILITIES
/WISCONSIN STATE CAPITOL
|
Specialty Engineering Group LLC
|
$850,000
|
List
|
5/31/2023
| No |
22D1H
(Proposal)
|
5/12/2023
Plan Holders
|
6/14/2023
|
Cross Connection Control Repairs
|
UNIVERSITY OF WISCONSIN/
STEVENS POINT CAMPUS
/COLLEGE-NATURAL RESOURCES
|
IMEG Corporation
|
$170,000
|
Coddington
|
| No |
18H2JREBID GPC
Revised
5/24/2023
|
4/3/2023
Plan Holders
|
6/13/2023
|
New Secure Residential Treatment Unit and Diversion Unit
GPC Bidding rescheduled to 6/13/2023
Addenda to Date: 4
|
CORRECTIONS/
OSHKOSH CORRECTIONAL INSTITUTION, OSHKOSH
|
Venture Architects
|
$1,884,000
|
Hoffmann
|
4/12/2023
| No |
20A1OREBID
(Proposal)
|
5/3/2023
Plan Holders
|
6/13/2023
|
South Housing Ventilation Upgrades
|
CORRECTIONS/
PRAIRIE DU CHIEN CORRECTIONAL FACILITY
/BUILDNG F-SOUTH HOUSING
|
Thunderbird Engineering, Inc.
|
$145,000
|
Stephan
|
5/17/2023
| No |
21A3J GPC
|
4/24/2023
Plan Holders
|
6/13/2023
|
Bathroom and Program Space Remodel
Addenda to Date: 1
|
HEALTH SERVICES/
SOUTHERN WISCONSIN CENTER, UNION GROVE
/EDUCATION BLDG
|
OPN Architects, Inc.
|
$1,829,000
|
Janus
|
5/16/2023
| No |
21J3A
(Proposal)
|
5/8/2023
Plan Holders
|
6/13/2023
|
Secure Cart Path Construction
|
CORRECTIONS/
GREEN BAY CORRECTIONAL INSTITUTION
/SEGREGATION BUILDING
|
Ayres Associates, Inc.
|
$221,000
|
Wischhoff
|
6/5/2023
| No |
22H3T GPC
|
5/12/2023
Plan Holders
|
6/13/2023
|
Hay Storage Building Reconstruction
GPC Only
|
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
|
Arc-Int Architecture
|
$650,000
|
Luttrell
|
5/31/2023
| No |
20F2QREBID2 GPC
Revised
5/26/2023
|
4/19/2023
Plan Holders
|
6/8/2023
|
Elevator Modernization
Bidding has been cancelled.
Addenda to Date: 1
|
UNIVERSITY OF WISCONSIN/
RIVER FALLS CAMPUS
/WYMAN EDUCATION BUILDING
|
Lien & Peterson Architects, Inc.
|
$423,000
|
Balciunas
|
5/9/2023
| No |
21C2HREBID2 GPC
|
5/5/2023
Plan Holders
|
6/8/2023
|
Roof Replacement
GPC Only
|
MILITARY AFFAIRS/
GREEN BAY
/ARMORY-GREEN BAY
|
Building Envelope Professionals Group LLC
|
$980,000
|
Kirchstein
|
5/16/2023
| No |
21I3K STC
|
5/3/2023
Plan Holders
|
6/8/2023
|
Door Controls System Upgrade
Single Trade Contract - Electrical
Addenda to Date: 1
|
HEALTH SERVICES/
SECURE TREATMENT FACILITY, MAUSTON
|
Powrtek Engineering, Inc.
|
$635,000
|
Stehly
|
5/18/2023
| No |
21L3I MEP
|
4/26/2023
Plan Holders
|
6/8/2023
|
Cliffwood Toilet Shower Building Replacement
|
NATURAL RESOURCES/
MIRROR LAKE STATE PARK
/TOILET - TOILET/SHOWER
|
Jewell Associates Engineers Inc
|
$1,040,000
|
Schaefer
|
5/23/2023
| No |
22D4PREBID
(Proposal)
|
4/26/2023
Plan Holders
|
6/8/2023
|
Fence Upgrades
|
CORRECTIONS/
MILWAUKEE MEN'S PRERELEASE CENTER, MILWAUKEE
/PRERELEASE CENTER
|
Oneida Total Integrated Enterprises (OTIE)
|
$175,000
|
Becker
|
| No |
22F4C
(Proposal)
|
4/28/2023
Plan Holders
|
6/8/2023
|
Shower Building Tiling and Improvements
Addenda to Date: 1
|
NATURAL RESOURCES/
NORTHERN HIGHLAND STATE FOREST
/TOILET - TOILET/SHOWER
|
Lien & Peterson Architects, Inc.
|
$230,000
|
Kolaszewski
|
| No |
20I1HREBID MEP
|
4/18/2023
Plan Holders
|
6/7/2023
|
Fire Suppression System Renovation
|
UNIVERSITY OF WISCONSIN/
UW EXTENSION
/GEOL & NAT HISTORY STORAGE
|
Thunderbird Engineering, Inc.
|
$520,000
|
Coddington
|
5/17/2023
| No |
21L2V
(Proposal)
|
4/28/2023
Plan Holders
|
6/7/2023
|
Construct Unit Storage Building
|
MILITARY AFFAIRS/
FOND DU LAC
/ARMORY-FOND DU LAC
|
McGowan Architecture LLC
|
$196,000
|
Becker
|
5/23/2023
| No |
22A2IREBID
(Proposal)
|
5/3/2023
Plan Holders
|
6/7/2023
|
Concrete Stairs and Sidewalk Replacement
|
HEALTH SERVICES/
MENDOTA MENTAL HEALTH INSTITUTE, MADISON
|
Jewell Associates Engineers Inc
|
$240,000
|
Wischhoff
|
5/23/2023
| No |
22A2K MEP
|
4/28/2023
Plan Holders
|
6/7/2023
|
Boiler 6 Installation
|
HEALTH SERVICES/
MENDOTA MENTAL HEALTH INSTITUTE, MADISON
/HEAT PLNT BOILER ADDN
|
Ring & DuChateau, LLP
|
$3,500,000
|
Jansen
|
5/15/2023
| No |
22B3L GPC
Revised
5/25/2023
|
4/21/2023
Plan Holders
|
6/7/2023
|
Shower Replacements
Bidding has been cancelled.
Addenda to Date: 1
|
UNIVERSITY OF WISCONSIN/
STOUT CAMPUS
/RED CEDAR HALL
|
Cedar Corporation
|
$769,800
|
Wenzel
|
5/8/2023
| No |
22C4X GPC
|
4/28/2023
Plan Holders
|
6/7/2023
|
Roof Replacement
GPC Only
Addenda to Date: 1
|
UNIVERSITY OF WISCONSIN/
EAU CLAIRE CAMPUS
/CHANCELLORS HALL
|
Lien & Peterson Architects, Inc.
|
$564,800
|
Balciunas
|
5/18/2023
| No |
22H3DREBID
(Proposal)
|
4/20/2023
Plan Holders
|
6/7/2023
|
Security Glass Replacement
|
CORRECTIONS/
COLUMBIA CORRECTIONAL INSTITUTION, PORTAGE
/MULTI - BUILDING
|
Specialty Engineering Group LLC
|
$221,000
|
Quilling
|
5/16/2023
| No |
21F2P
(Proposal)
|
5/5/2023
Plan Holders
|
6/6/2023
|
Shooting Range Improvements
|
CORRECTIONS/
WAUPUN CORRECTIONAL INSTITUTION, WAUPUN
/RANGE STORAGE BLDG
|
McGowan Architecture LLC
|
$233,000
|
Wischhoff
|
5/11/2023
| No |
22D4E GPC
|
4/26/2023
Plan Holders
|
6/6/2023
|
Roof Replacement
GPC Only
|
CORRECTIONS/
GORDON CORRECTION CENTER, GORDON
/BUNKHOUSE
|
Lien & Peterson Architects, Inc.
|
$262,000
|
Balciunas
|
5/17/2023
| No |
22E2H GPC
|
4/20/2023
Plan Holders
|
6/6/2023
|
Driveway Replacement
GPC Only
|
TRANSPORTATION/
DMV - DISTRICT 3
/DMV SVC CTR-ONALASKA
|
JT Engineering, Inc.
|
$325,100
|
Yahnke
|
| No |
22G2E
(Proposal)
|
4/20/2023
Plan Holders
|
6/6/2023
|
Replace Boiler
|
MILITARY AFFAIRS/
CAMP WILLIAMS
/DORM (VOLK)
|
Henneman Engineering, Inc.
|
$115,000
|
Pearce
|
5/16/2023
| No |